You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Compressive Spectral Video in the LWIR

    SBC: PHYSICAL SCIENCES INC.            Topic: A13AT015

    Physical Sciences, Inc. and Colorado State University will advance the technical maturity of the Compressive Sensing Hyperspectral Imager (CS-HSI) platform. The CS-HSI operates in the longwave infrared (LWIR) spectral range with a single-pixel architecture for low-cost, standoff wide area Early Warning of chemical vapor plumes. The motivation for applying CS to LWIR HSI is to eliminate the high-co ...

    STTR Phase II 2019 Department of DefenseArmy
  2. Runnable Environment for Team Effectiveness and Assessment Metrics (re-TEAM)

    SBC: MODUS OPERANDI INC            Topic: A18BT008

    The most critical component of any modern enterprise is effective use of its human resources. The rise of productivity-boosting applications and wearable sensors has provided individual users with data-driven insights into their own effectiveness. Despite these advancements there has not been a corresponding rise in tools for evaluating and improving the effectiveness of teams as a whole. New wear ...

    STTR Phase I 2019 Department of DefenseArmy
  3. Scalable Manufacturing of Functional Yarns for Textile Energy Storage

    SBC: STORAGENERGY TECHNOLOGIES INC            Topic: A17AT013

    To further accelerate the commercialization process of our supercapactior yarns, we plan to further lower the production cost, enhance our yearn performance and optimize customer experience via materials and process engineering and innovative platform development. The major deliverable of this sequential Phase II project is to demonstrate the throughput capacity of a large area supercapactior fabr ...

    STTR Phase II 2019 Department of DefenseArmy
US Flag An Official Website of the United States Government