You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
In-Situ Measurement of Plasma Deposition Coating Thickness
SBC: TECHNICAL SOLUTIONS, INC. Topic: N/AA significant problem in precision manufacturing of large parts/assemblies is the requirement to make measurements over the surfacesof these parts for a variety of reasons including inspection/quality control; control of surfacing operations such as coatings, abrasive erosion, buffing, and texturing; and generation of "as built" documentation. A specific instance of this class of problem has been ...
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency -
Electron Beam Destruction and Removal of Volatile Organic Chemicals and Metal in the Presence of Titanium Dioxide
SBC: Tetra Corporation Topic: N/ATetra Corporation proposes to investigate an innovative treatement process for the combined removal of metallic ions and the destruction of volatile organic chemicals in waste water. Both metal ion and volatile organic contaminants are commonly found in water. Tetra Corporation would thus propose to investigate the removal of metal ions and the destruction of volatile organic chemicals from contam ...
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
Analysis of Low Grazing-Angle Forward Scatter Data from the Mountain-Top Propagation Experiment
SBC: INFORMATION SYSTEMS LABORATORIES INC Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency