You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN APPLICATION OF THE ANALYTIC HIERARCHY PROCESS TO THE WARFARE SYSTEMS ARCHITECT AND ENGINEER INTEGRATED ASSESSMENT ENVIRONMENT

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    A NOVEL APPROACH TO ASSESSING THE PERFORMANCE OF COMBINED U.S. NAVAL BATTLE FORCES IS PROPOSED. A MODEL SYSTEM BASED UPON THE ANALYTIC HIERARCHY PROCESS (AHP) AND THE USE OF PAIRWISE COMPARISON MATRICES IS USED TO DETERMINE THE RELATIVE VALUE OF COMPONENTS OF PROJECTING POWER IN THE WARFARE MISSION AREAS. THIS POWER MEASURE COMBINED ESTIMATES OF VULNERABILITY GENERATED IN A SIMILAR FASHION ARE THE ...

    SBIR Phase I 1990 Department of DefenseNavy
  2. An ASTROS Compatible Computational Strategy for Evaluating the Aeroelastic Response, Buckling and Integrity of Comp. A/C

    SBC: Knowledge Systems Inc.            Topic: N/A

    An ASTROS compatible computational strategy for evaluating the aeroelastic response, buckling and integrity of aircraft structures made of advanced laminated composite materials is proposed. The proposed computational strategy will be global/local in nature and as such will include the capability to analyze the global stress, vibration, buckling and aeroelastic response of aircraft structures mad ...

    SBIR Phase II 1996 Department of DefenseAir Force
  3. Anechoic Chamber Simulation, Optimization and Synthesis Software Program

    SBC: VOSS SCIENTIFIC LLC            Topic: N/A

    Commercial and military uses of RF/microwave anechoic chambers to conduct electromagnetic measurements of one type or another has increased considerably in recent years. unfortunately anechoic chambers can be very expensive to build ($0.5M for small chambers, to many $M for large chambers), and operate = man weeks of effort are often required to configure and run a chamber for a specific test. C ...

    SBIR Phase II 1996 Department of DefenseAir Force
  4. An Efficient, Unstructured Flow Solver for Complex Aircraft Configurations in Maneuvering Flight

    SBC: AEROSOFT INC            Topic: N/A

    AeroSoft proposes the development of efficient and accurate Computational Fluid Dynamics methods for calculating the airflow characteristics over complex bodies with time-dependent, Reynolds-Averaged, Navier-Stokes equations which have been augmented to allow for dynamic meshes as well as non-equilibrium chemistry and thermodynamics. The dynamic-mesh approach proposed here is based on ...

    SBIR Phase II 1997 Department of DefenseAir Force
  5. An Efficient, Unstructured Flow Solver for Complex Aircraft Configurations in Maneuvering Flight

    SBC: AEROSOFT INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  6. A NEURAL NETWORK SOLUTION TO THE REAL-TIME OPTIMAL ALLOCATION OF MARINE CORPS TACTICAL AND C3I ASSETS

    SBC: Ikonix Inc            Topic: N/A

    THE EFFICIENCY WITH WHICH ASSETS ARE ALLOCATED DURING COMBAT HAS USUALLY PLAYED A DOMINANT ROLE IN THE OUTCOME OF THE CONFLICT -OFTEN ECLIPSING ALL OTHER FACTORS, INCLUDING VARIANCES IN FORCE STRUCTURE. THE SOLUTION OF OPTIMAL ALLOCATION PROBLEMS IS NO LESS CRITICAL TO THE DESIGN AND OPERATION OF C3I NETWORKS. THUS, THE ABILITY TO PERFORM THIS ENABLING TASK AS EFFICIENTLY AS POSSIBLE IS VITAL. WE ...

    SBIR Phase I 1990 Department of DefenseNavy
  7. An Improved Plasma Opening Switch for DECADE

    SBC: NumerEx            Topic: N/A

    CURRENT ATTEMPTS TO USE THE PLASMA OPENING SWITCH (POS) FOR DECADE HAVE NOT YET BEEN ENTIRELY SUCCESSFUL DUE TO THE APPARENT INABILITY OF THE SWITCH TO OPEN EFFICIENTLY TO A HIGH-IMPEDENCE LOAD. RESEARCH DIRECTED TOWARD IMPROVING THE PERFORMANCE OF THE POS IN THE LONG-CONDUCTION TIME REGIME HAS BEEN FRUSTRATED BY THE INABILITY OF COMPUTATIONAL TOOLS TO OPERATE IN THE PARAMETER REGIMES OF INTEREST ...

    SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency
  8. An Innovative Pulse Detonation Engine

    SBC: Adroit Systems, Inc.            Topic: N/A

    Currently, airbreathing propulsion systems which operate in the subsonic to high supersonic regime are expensive, complex and heavy. To overcome these limitations, a novel propulsion concept based on a liquid hydrocarbon-fueled Pulse Detonation Engine (PDE) is proposed. The innovation draws from recent successes in computational fluid dynamics and from several engineering studies and PDE develop ...

    SBIR Phase II 1996 Department of DefenseNavy
  9. An Innovative Pulse Detonation Rocket Engine

    SBC: Adroit Systems, Inc.            Topic: N/A

    The opportunity addressed in this proposal is an innovative pulse detonation rocket engine (PDRE) which could significantly out-perform current state-of-the-art chemical rocket propulsion systems. The innovation is based in a novel combustion concept developed by Adroit Systems, Inc. (ASI) in the area of airbreathing pulse detonation propulsion. The concept relies on detonation combustion, as op ...

    SBIR Phase II 1997 Department of DefenseAir Force
  10. An Integrated Design System

    SBC: Phoenix Integration, Inc.            Topic: N/A

    Phoenix Integration, Inc. proposes a 6 month design and feasibility study to investigate application of innovative software techniques toward an integrated program for the design and analysis of combat weapon subsystems. There is a recognized deficiency in the area of compatible ship design modules that allow weapon system concepts to be quickly configured and analyzed. A modeling and analysis to ...

    SBIR Phase II 1997 Department of DefenseNavy
US Flag An Official Website of the United States Government