You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Barrier Coatings for Continuous Silicon-Carbide Fibers in Ceramic Composites
SBC: Advanced Ceramics Corp. Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
Affordable Computer Based Trainers
SBC: Advanced Creations, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Nanoelectric Modeling Software Development
SBC: Advanced Device Technologies, Topic: N/AThis Phase I project has two primary objectives. The first objective is to develop an engineering model of Resonant Tunneling Devices (RTD) to be implemented in AIM-Spice, a commercial software package running under Windows 95/NT. The development of a reliable device model is a prerequisite for the design and production of any semiconductor device technology. The RTD model will be a semi-empiri ...
SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency -
Ion-Implanted 2-D MESFET Technology for Wireless Communications
SBC: Advanced Device Technologies, Topic: N/AThis Phase I project has two primary objectives. The first objective is to evaluate the feasibility of a fully ion implanted fabrication process based on the heterodimensional 2-D MESFET. The new device, the 2-D JFET, will have p+ ion implanted sidegates which laterally modulate a thin, highly doped n-type conducting channel. The 2-D JFET should have excellent high speed, low power characteristics ...
SBIR Phase I 1997 Department of DefenseMissile Defense Agency -
A MODEL FOR PREDICTING THE PERFORMANCE DETERIORATION IN GAS TURBINE ENGINES
SBC: Advanced Engineering Research, LLC Topic: N/AA MODEL FOR PREDICTING THE PERFORMANCE IMPACT OF ENGINE DETERIORATION IS PROPOSED FOR FEASIBILITY EVALUATION. THIS MODEL WOULD ACCOUNT FOR ROTATING COMPONENT DETERIORATION SUCH AS INCREASED TIP CLEARANCES, SURFACE ROUGHNESS, LEADING EDGE BLUNTNESS AND VAN BOW AND TWIST. THE PROPOSED APPROACH USES A STAGE STACKING METHOD TO ALLOCATE LOSSES THROUGHOUT THE ENGINE WHICH ARE DEPENDENT ON OPERATING TIME ...
SBIR Phase I 1990 Department of DefenseNavy -
HIGH S/N, HEAD AND NECK VOLUME PHASED ARRAY FOR NMR
SBC: ADVANCED IMAGING RESEARCH, INC. Topic: N/AIn Phase I, a head and neck array prototype RF coil capable of operating in the multiple (head only, neck only, head & neck) modes will be developed at l.5T. Phantom measurements and preliminary volunteer scans will be obtained to evaluate the signal-to-noise, uniformity, coverage, claustrophobia, etc. Phase II will involve optimizing the coil design, followed by extensive phantom and volunteer ev ...
SBIR Phase I 1997 Department of Health and Human Services -
Command Level Drug Testing Strategy
SBC: Advanced Marine Enterprises, Topic: N/AA stratified random sampling technique is used to minimize the time until detection of users of illicit drugs. The stratification is based on likelihood of drug use and importance of the billet occupied. Likelihood of drug used is calculated from fundamental characteristics (e.g., age, sex, education), performance, health and behavior (e.g., relative amount of sick leave, unusual behavior) ...
SBIR Phase I 1996 Department of DefenseNavy -
US FLAG COASTAL RO/RO SHIPS; APPLICATION OF CASSETTE TECHNOLOGY
SBC: Advanced Marine Enterprises, Topic: N/ATHIS STUDY WILL EVALUATE THE RANGE OF SHIP SIZES AND POWER LEVELS (SPEEDS) TO DETERMINE THE OPTIMUM SHIP CHARACTERISTICS FOR OPERATING U.S. FLAG RO/RO SHIPS IN U.S. COASTAL SERVICE. RO/RO CARGO HANDLING TECHNIQUES PREVALENT IN EUROPE AND SCANDINAVIA WILL BE INCORPORATED AS A FUNDAMENTAL ELEMENT OF THE SERIES OF SHIPS INVESTIGATED. THESE TECHNIQUES INVOLVE THE USE OF CASSETTES TO HANDLE CONTAINERS ...
SBIR Phase I 1994 Department of Transportation -
Massively Parallel Processing for Image Processing
SBC: A & O, Inc. Topic: N/AThe project addresses the development of a 64K Massively Parallel P rocessor (MPP) accelerator board together with OS software for installation on a HP-748 workstation providing generation of real-time, high-fidelity, high pixel density and high refresh rate graphic images. The MPP board will be based on associative string processors (ASPs) in a modular massively parallel computer (MPC) ar ...
SBIR Phase I 1996 Department of DefenseNavy -
Integrated Micromachined Angular Rate Sensor
SBC: ADVANCED MICROMACHINES, INC. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseArmy