You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Instructional Authoring System Development for Network

    SBC: DATAMAT SYSTEMS RESEARCH, INC.            Topic: N/A

    Developing interactive and adaptive courses on the Internet can be very expensive. The Internet technology will be a viable solution to the education and training problem only if the cost of developing new instructional products can be made comparable to costs for traditional instruction. This focuses attention directly on the software tool that is used for the creation of interactive instruction ...

    SBIR Phase I 1997 Department of Education
  2. Development of a Night Driving Simulator

    SBC: DCS CORP.            Topic: N/A

    The use of night vision devices (NIVUs) by US Army foot soldiers, aviators, and drivers of combat and tactical wheeled vehicles has enhanced operations at night by allowing increased mobility and potentially safer operations. With this increased capability in the night environment has come an increased exposure to the hazards of that environment and the risks that the command structure must manag ...

    SBIR Phase I 1997 Department of DefenseArmy
  3. PATIENT REGISTRATION SYSTEM FOR RADIATION THERAPY

    SBC: DCS CORP.            Topic: N/A

    In radiation oncology, it is important to precisely position patients undergoing radiation therapy repeatably during each session over the course of treatment. Current methods for doing this positioning are time consuming and do not meet the accuracy requirements of advanced 3-D radiation treatment planning. DCS Corporation has developed an innovative high-speed 3-D topographical surface mapping ...

    SBIR Phase I 1997 Department of Health and Human Services
  4. Acoustic Towed Array Position Measurement System for Nuclear Submarines

    SBC: DDL Omni Engineering, LLC            Topic: N/A

    DDL OMNI Engineering proposes to design a secure system for the continuous, real time acoustic measurement of towed array position relative to the host submarine. By using focused transmit and receive assemblies, pseudo- random spread broadband signals, and relatively high carrier frequency, the transmission level will be minimized so as to be virtually undetectable by a non-dedicated system ...

    SBIR Phase I 1997 Department of DefenseNavy
  5. MATURE MARKET PROFILER--A NATIONAL AND LOCAL SYSTEM

    SBC: DECISION DEMOGRAPHICS            Topic: N/A

    Older Americans represent a massive consumer market that is just beginning to be served effectively. The Mature Market Profiler offers an innovative and integrated information system that enables businesses and service providers to better target and deliver their products and services to this fast growing and diverse segment of the population. The system uses a specially-designed survey that exp ...

    SBIR Phase I 1997 Department of Health and Human Services
  6. Software Metrics Decision Support System

    SBC: Decision Science Associates            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  7. SBIR Phase I: Ground Truthing Approach to Risk Assessment and Communication Under Uncertainty

    SBC: Decisionfx            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  8. Reconfigurable Operator Station Simulator (ROSS)

    SBC: Defense Group Inc.            Topic: N/A

    The Reconfigurable Operator Station Simulator (ROSS) project will provide designers of operator stations for Uninhabited Aerial Vehicles (UAVs) with a rapid prototyping system. In addition, the architecture on which ROSS is based provides a platform on which to build tools that increase the ability of operators to control UAVs and to impart a far greater understanding of the situation to them. T ...

    SBIR Phase I 1997 Department of DefenseAir Force
  9. Automatic Feature Combined Track-Detect-Localize Technique

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    A progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...

    SBIR Phase I 1997 Department of DefenseNavy
  10. Enhanced/Operator Machine Interface

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    The sensor processing requirements needed to counter today's threats pose a major challenge to the air avionics sensor operator (SENSO) due both to the complexity of the sensors and task load increases. Today's SENSO has limited opportunity for realistic anti-submarine warfare (ASW) practice and experience. In environments where experienced mentors are available, new operators are assisted ...

    SBIR Phase I 1997 Department of DefenseNavy
US Flag An Official Website of the United States Government