You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEPRESSED COLLECTORS FOR MEGAWATT GYROTRONS

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    A PROGRAM IS PROPOSED TO SHOW THE FEASIBILITY OF DEPRESSED COLLECTORS FOR VERY HIGH AVERAGE POWER (APPROX. 1MW) GYROTRON OSCILLATORS FOR FUSION APPLICATIONS. INITIAL CALCULATIONS INDICATE THAT COLLECTION EFFICIENCIES EXCEEDING 75% CAN BE REALIZED. USE OF SUCH A COLECTOR ON A GYROTRON WITH A BASE EFFICIENCY OF 30% WOULD INCREASE THE EFFICIENCY TO OVER 60%. SUCH A DRAMATIC INCREASE IN EFFICIENCY WOU ...

    SBIR Phase I 1990 Department of Energy
  2. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  5. AN INFRARED OPTOACOUSTIC SPECTROMETER WITH WIDE APPLICABILITY FOR MEASUREMENT OF TRACE GAS CONCENTRATIONS

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    EXISTING INSTRUMENTATION FOR CHEMICAL ANALYSIS OF GAS MIXTURES DO NOT PROVIDE THE CAPABILITY FOR REAL-TIME MEASUREMENT OF A BROAD RANGE OF SPECIES AT TRACE (PPB) CONCENTRATION LEVELS. SUCH A CAPABILITY IS IMPORTANT IN MANY APPLICATIONS IN ATMOSPHERIC RESEARCH, POLLUTION CONTROL, TOXIC GAS SENSING, AND INDUSTRIAL PROCESS MONITORING. ALTHOUGH SPECIALIZED LASER METHODS HAVE BEEN DEMONSTRATED FOR MEAS ...

    SBIR Phase I 1987 Department of Energy
  6. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1993 Nuclear Regulatory Commission
  7. ROBOTIC WALL SCRUBBER FOR NUCLEAR REACTOR WELLS AND FUEL STORAGE POOLS

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    DURING THE REFUELING OPERATIONS AT A NUCLEAR POWER PLANT, IT IS NECESSARY TO FLOOD LARGE CAVITIES ABOVE THE REACTOR PRESSURE VESSEL WITH WATER TO PROVIDE RADIATION SHIELDING. THE SPENT FUEL IS TRANSPORTED THROUGH THESE CAVITIES TO A TEMPORARY STORAGE POOL LOCATED NEAR THE REACTOR. OTHER CONTAMINATED INTERNAL REACTOR COMPONENTS ARE ALSO STORED WITHIN THESE CAVITIES DURING REFUELING. ONCE THE REFUEL ...

    SBIR Phase I 1990 Department of Energy
  8. INLET-PRECHARGED LIMESTONE EMISSION CONTROL (LEC) PROJECT

    SBC: ETHERWARE, LLC            Topic: N/A

    MANY UTILITY AND INDUSTRY COAL-FIRED BOILERS HAVE ELECTROSTATIC PRECIPITATORS (ESPS) ALONE, WHICH ARE NOT CAPABLE OF REMOVING SO2. MANY OLDER ESPS WILL REQUIRE UPGRADING IN THE 1990S TO MEET MORE STRINGENT PARTICULATE STANDARDS. ETS, INC. HAS TESTED ITS PATENTED LIMESTONE EMISSION CONTROL (LEC) SYSTEM, DEMONSTRATING GREATER THAN 90% SO2 REMOVAL CAPABILITY. LECS CAN BE PLACED DOWNSTREAM OF ESPS. IT ...

    SBIR Phase I 1990 Department of Energy
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
US Flag An Official Website of the United States Government