You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Large Room Temperature Cd1-xZnxTe Detectors

    SBC: World Physics Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. INLET-PRECHARGED LIMESTONE EMISSION CONTROL (LEC) PROJECT

    SBC: ETHERWARE, LLC            Topic: N/A

    MANY UTILITY AND INDUSTRY COAL-FIRED BOILERS HAVE ELECTROSTATIC PRECIPITATORS (ESPS) ALONE, WHICH ARE NOT CAPABLE OF REMOVING SO2. MANY OLDER ESPS WILL REQUIRE UPGRADING IN THE 1990S TO MEET MORE STRINGENT PARTICULATE STANDARDS. ETS, INC. HAS TESTED ITS PATENTED LIMESTONE EMISSION CONTROL (LEC) SYSTEM, DEMONSTRATING GREATER THAN 90% SO2 REMOVAL CAPABILITY. LECS CAN BE PLACED DOWNSTREAM OF ESPS. IT ...

    SBIR Phase I 1990 Department of Energy
  3. DEPRESSED COLLECTORS FOR MEGAWATT GYROTRONS

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    A PROGRAM IS PROPOSED TO SHOW THE FEASIBILITY OF DEPRESSED COLLECTORS FOR VERY HIGH AVERAGE POWER (APPROX. 1MW) GYROTRON OSCILLATORS FOR FUSION APPLICATIONS. INITIAL CALCULATIONS INDICATE THAT COLLECTION EFFICIENCIES EXCEEDING 75% CAN BE REALIZED. USE OF SUCH A COLECTOR ON A GYROTRON WITH A BASE EFFICIENCY OF 30% WOULD INCREASE THE EFFICIENCY TO OVER 60%. SUCH A DRAMATIC INCREASE IN EFFICIENCY WOU ...

    SBIR Phase I 1990 Department of Energy
  4. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  5. AN ULTRA FAST SCINTILLATOR FOR WELL LOGGING APPLICATIONS

    SBC: TPL, Inc.            Topic: N/A

    BECAUSE OF THEIR LONG DECAY TIMES, SCINTILLATORS IN NEUTRON LOGGING TOOLS ARE RESPONSIVE PRIMARILY TO THE GAMMA RADIATION FROM THE NEUTRON CAPTURE SPECTUM. THIS INHIBITS POROSITY MEASUREMENTS IN GAS-FILLED ZONES AND SUBSTANTIALLY LIMITS THE ELEMENTAL INFORMATION ON THE STRATA WHICH CAN BE ACQUIRED. ADVANCES IN NEUTRON LOGGING TOOLS REQUIRE A NEW SCINTILLATOR MATERIAL CAPABLE OF MAKING PRECISION ME ...

    SBIR Phase I 1990 Department of Energy
  6. HEAVY METAL REMEDIATION OF SOIL USING PERMEABLE CHELATION BARRIERS

    SBC: TPL, Inc.            Topic: N/A

    REMEDIATION OF SOIL AND GROUNDWATER TO REDUCE HEAVY METAL CONTAMINANTS TO BACKGROUND LEVELS POSES A SERIOUS CHALLENGE. CONVENTIONAL METHODS ARE ABLE TO REDUCE CONTAMINATION LEVELS, BUT TOTAL REMEDIATION, DEFINED AS ACHIEVEMENT OF BACKGROUND LEVELS OF THE METAL, MAY NOT BE ECONOMICALLY FEASIBLE. A PERMEABLE CHELATION BARRIER CONTAINING SILICA GEL MODIFIED TO CHELATE HEAVY METALS PROVIDES AN ECONO ...

    SBIR Phase I 1994 Department of Energy
  7. Highly Branched, Lightly Crosslinked, Solid Polymer Electrolytes

    SBC: TPL, Inc.            Topic: N/A

    40690 TPL, Inc. This project will develop a novel solid polymer electrolyte (SPE) that will significantly increase the practical power and energy density of state-of-the-art secondary lithium batteries. The approach will yield carbosilane-based electrolytes with high conductivities and low transference numbers. Covalently attaching thin films of these novel electrolytes to high energy density c ...

    SBIR Phase I 1996 Department of Energy
  8. Metal-Binding Silica Materials for Wastewater Cleanup

    SBC: TPL, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  9. CONTAMINATION-TOLERANT ANODES FOR PROTON EXCHANGE MEMBRANE FUEL CELLS

    SBC: LYNNTECH INC            Topic: N/A

    THERE IS A RENEWED INTEREST IN FUEL CELLS AS PRIMARY POWER SOURCES FOR ELECTRIC VEHICLES. THE ACIDIC PROTON EXCHANGE MEMBRANE FUEL CELL OPERATES AT A MAXIMUM TEMPERATURE OF 95 DEGREES CENTIGRADE AND, AT PRESENT, RELIES ON THE USE OF PLATINUM-BASED ELECTROCATALYSTS. FOR ACID FUEL CELLS OPERATING AT TEMPERATURES BELOW 130 DEGREES CENTIGRADE, HYDROGEN IS THE MOST ACTIVE COMMON FUEL THAT CAN BE USED ...

    SBIR Phase I 1994 Department of Energy
  10. An Easily Dispersed Reactive Coating for Surface Decontamination

    SBC: LYNNTECH INC            Topic: N/A

    126 An Easily Dispersed Reactive Coating for Surface Decontamination--Lynntech, Inc., 7610 Eastmark Drive, Suite 105, College Station, TX 77840-4023; (409) 693-0017 Dr. Anthony Giletto, Principal Investigator Dr. Oliver J. Murphy, Business Official DOE Grant No. DE-FG03-97ER82420 Amount: $75,000 Terrorist nerve gas attacks are a growing concern facing emergency response teams. Decontam ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government