AVTEC SYSTEMS, INC.

Basic Information

14432 Albemarle Point Place
Chantilly, VA, 20151

Company Profile

n/a

Additional Details

Field Value
DUNS: 7790512
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 80


  1. Multisensor Time Synchronization

    Amount: $748,588.00

    In Phase I, Avtec demonstrated a technique that uses the structure of tactical communications systems to provide a reliable and precise relative time and range synchronization between the participatin ...

    SBIR Phase II 2005 Air ForceDepartment of DefenseDepartment of Defense
  2. HWIL Fading Channel Simulator for Testing Kill Vehicle & IFICS Modems for Ground-based Midcourse Defense (GMD)

    Amount: $99,651.00

    Avtec System's proposes creating a Hardware-in-the-Loop (HWIL) Fading Channel Simulator built on the foundation of our Integrated Communications Module (ICM) Test System and Wideband Analog Signal Pro ...

    SBIR Phase I 2005 Missile Defense AgencyDepartment of DefenseDepartment of Defense
  3. High Fidelity RF Emitter Parameter Generation Capability

    Amount: $99,836.00

    Avtec Systems, Inc. proposes creating a High Fidelity RF Parameter Generator built on the foundation of our Wideband Analog Signal Processing (WASP) Board. In order to provide the waveform reconstruc ...

    SBIR Phase I 2005 Air ForceDepartment of DefenseDepartment of Defense
  4. Precision Constellation Position Determination

    Amount: $69,991.00

    For a distributed aperture sensor, especially at infrared and optical wavelengths, the relative position of the aperture components must be known and controlled precisely. When the aperture component ...

    SBIR Phase I 2004 National Aeronautics and Space Administration
  5. Multisensor Time Synchronization

    Amount: $99,903.00

    Avtec proposes a technique that uses the structure of tactical communications systems to provide a reliable and precise relative time and range synchronization between the participating platforms. Th ...

    SBIR Phase I 2004 Air ForceDepartment of DefenseDepartment of Defense
  6. Wideband Telemetry Over Internet Protocol Networks in Real Time (TM/IP)

    Amount: $99,921.00

    The Air Force and other DoD agencies are seeking transformational communications and technology that will support legacy and future mission data transfers over lower-cost and more reliable network inf ...

    SBIR Phase I 2003 Air ForceDepartment of DefenseDepartment of Defense
  7. Real-Time Adaptability to the Dynamic Tactical Network

    Amount: $0.00

    In Phase II, the focus is select real world scenarios to demonstrate an actual implementation and to evaluate the performance of the proposed dynamic networking. Avtec will focus on the following Tim ...

    SBIR Phase I 2003 NavyDepartment of DefenseDepartment of Defense
  8. Real-Time Adaptability to the Dynamic Tactical Network

    Amount: $599,026.00

    In Phase II, the focus is select real world scenarios to demonstrate an actual implementation and to evaluate the performance of the proposed dynamic networking. Avtec will focus on the following Tim ...

    SBIR Phase II 2003 NavyDepartment of DefenseDepartment of Defense
  9. HF to UHF Camouflaged Antenna

    Amount: $99,995.00

    Avtec views this SOCOM program as an RF systems development program, more than just an antenna development program. The family of antennas developed under this program must work with a wide range of c ...

    SBIR Phase I 2003 Special Operations CommandDepartment of DefenseDepartment of Defense
  10. ICM FOR GPS SIMULATIONS

    Amount: $744,000.00

    "In order to evaluate the effects of new navigation systems that integrate communications, GPS and augmentation systems, the Air Force needs an Integrated Communications Module (ICM) that dynamically ...

    SBIR Phase II 2002 Air ForceDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government