Bakhtar Assoc.

Basic Information

3420 Via Oporto, Suite 201
Newport Beach, CA, 92663 0266

Company Profile

n/a

Additional Details

Field Value
DUNS: 625413240
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 8


  1. Performance Assessment of Penetrator Weapons

    Amount: $749,684.00

    "There is a growing interest by our adversaries to utilize underground facilities for production and storage of "weapons-of-mass destruction" (WMD) and military hardware. Mechanized or conventional ex ...

    SBIR Phase II 2002 Air Force Department of Defense
  2. Performance Assessment of Penetrator Weapons

    Amount: $99,960.00

    An innovative and cost-effective technique, based on physical scale-model testing at 1-g, is presented to evaluate the performance of the next generation penetrator missiles designed to take out under ...

    SBIR Phase I 2001 Air Force Department of Defense
  3. Development of Reflection Tomography Software and Antennae for ErthRadar Buried UXO/Clutter Detection and Discrimination

    Amount: $690,804.00

    The primary objective of this SBIR effort is to develop and refine UXO detection, location, and discrimination technologies. The development of such technologies are achieved through systematic resea ...

    SBIR Phase II 1998 Air Force Department of Defense
  4. Development of Reflection Tomography Software and Antennae for ErthRadar Buried UXO/Clutter Detection an

    Amount: $57,435.00

    The primary objective of this SBIR effort is to develop and refine UXO detection, location, and discrimination technologies. The development of such technologies are achieved through systematic resea ...

    SBIR Phase I 1997 Air Force Department of Defense
  5. Detection and Disposal of Buried Bombs

    Amount: $733,580.00

    An innovative and cost-effective approach is proposed for site survey and detection of buried ordnance. The technique is based on development of a "ground penetrating radar" (GPR) and associated multi ...

    SBIR Phase II 1995 Air Force Department of Defense
  6. Detection and Disposal of Buried Bombs

    Amount: $59,678.00

    N/A

    SBIR Phase I 1994 Air Force Department of Defense
  7. DEVELOPMENT OF SAFETY CRITERIA FOR EXPLOSIVE STORAGE STRUCTURES

    Amount: $553,059.00

    AN INNOVATIVE AND COST-EFFECTIVE APPROACH IS PRESENTED FOR DEVELOPMENT OF EXPLOSIVE SAFETY (QUANTITY-DISTANCE) CRITERIA FOR SHALLOW TUNNELS. THE APPROACH PROPOSES TO FORMULATE AND VALIDATE THE SCALING ...

    SBIR Phase II 1992 Air Force Department of Defense
  8. DEVELOPMENT OF SAFETY CRITERIA FOR EXPLOSIVE STORAGE STRUCTURES

    Amount: $49,940.00

    N/A

    SBIR Phase I 1991 Air Force Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government