BAND, LAVIS & ASSOC., INC.

Basic Information

900 Ritchie Highway, Suite 203
Severna Park, MD, 21146

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 29


  1. Flight Verified Dynamic Simulation of the LCAC

    Amount: $69,946.00

    The LCAC Full-Mission Trainer (FMT) is providing a cost-effective tool for training LCAC operators in normal craft operation and casualty mode conditions. However, the FMT was never validated with fu ...

    SBIR Phase I 1998 Navy Department of Defense
  2. Parametric Analysis of Naval Ship Systems (PASS)

    Amount: $747,488.00

    A first-principle mathematical model, designed to analyze parametrically the whole- ship impact of advances in ship technology, is to be developed to a level necessary to demonstrate feasibility as a ...

    SBIR Phase II 1996 Navy Department of Defense
  3. Razing Amphibian Screw Propelled-RASP-

    Amount: $85,700.00

    The shallow-water and surf-zone mine clearance mission is being addressed by existing U. S. Navy programs. The clearance of manmade obstacles from the surf-zone and beach comprises an equal priorit ...

    SBIR Phase I 1995 Navy Department of Defense
  4. Parametric Analysis of Naval Ship Systems (PASS)

    Amount: $98,753.00

    N/A

    SBIR Phase I 1995 Navy Department of Defense
  5. KENETIC CHAIN

    Amount: $49,976.00

    THE PROPOSED DEVELOPMENT INVOLVES THE CHARACTERIZATION, EVALUATION AND MODIFICATION OF A CHAIN -SHOCK ABSORBER UTILIZED COMMERCIALLY. THESE SHOCK ABSORBERS CAN BE ASSEMBLED AS "LINKS" TO FORM A LENGTH ...

    SBIR Phase I 1991 Navy Department of Defense
  6. STABILIZATION OF THE SHIP/LIGHTER INTERFACE

    Amount: $531,000.00

    THE PROPOSED WORK TO ESTABLISH ONE OR MORE TECHNIQUES FOR OFFLOADING CONTAINERS AND BREAK-BULK IN ALL TYPES OF WEATHER DURING A LOTS MISSION CONSISTS OF A REVIEW OF CONCEPTS FOR SHIP STABILIZATION, LI ...

    SBIR Phase II 1988 Army Department of Defense
  7. STABILIZATION OF THE SHIP/LIGHTER INTERFACE

    Amount: $34,671.00

    N/A

    SBIR Phase I 1986 Army Department of Defense
  8. EXTREME SEAWAY LOADS CHARACTERIZATION FOR SHIP STRUCTURE

    Amount: $105,000.00

    SHIPS HAVE LONG BEEN DESIGNED TO EMPIRICAL FORMULATE THAT DO NOT REPRESENT REALISTIC CONDITIONS FOR MODERN NAVAL VESSELS IN EXTREME SEA CONDITIONS. AS A CONSEQUENCE, SHIPS FREQUENTLY SUFFER EXPENSIVE ...

    SBIR Phase II 1985 Navy Department of Defense
  9. EXTREME SEAWAY LOADS CHARACTERIZATION FOR SHIP STRUCTURE

    Amount: $34,618.00

    N/A

    SBIR Phase I 1983 Navy Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government