BD Systems Inc.

Basic Information

385 Van Ness Ave Suite 200
Torrance, CA, 00000

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: Y
Woman Owned: Y
Number of Employees: n/a


  1. Advanced Tether Dynamics Simulation

    Amount: $69,499.00

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  2. NEURAL NETWORK BASED FRF MEASUREMENT CHARACTERIZATION

    Amount: $598,131.00

    N/A

    SBIR Phase II 1997 National Aeronautics and Space Administration
  3. NEURAL NETWORK BASED FRF MEASUREMENT CHARACTERIZATION

    Amount: $69,821.00

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  4. RV TERMINAL UPDATE

    Amount: $198,000.00

    INCREASING THE ACCURACY OF REENTRY VEHICLES AND PROVIDING THE CAPABILITY TO ATTACK IMPRECISELY LOCATED OR RELOCATABLE TARGETS ARE GOALS WHOSE REALIZATION WOULD SUBSTANTIALLY ENHANCE THE SECURITY OF TH ...

    SBIR Phase II 1987 Air ForceDepartment of DefenseDepartment of Defense
  5. SPECIFICATION OF EXPERT SYSTEMS FOR THE AFSCF

    Amount: $200,000.00

    THIS EFFORT WILL PROVIDE A SET OF FOUR GUIDEBOOKS AND A SHORT COURSE FOR MANAGEMENT OF EXPERT SYSTEMS PROCUREMENT, TAILORED TO THE NEEDS OF THE AIR FORCE SATELLITE CONTROL FACILITY (AFSCF), BUT MODIFI ...

    SBIR Phase II 1987 Air ForceDepartment of DefenseDepartment of Defense
  6. MOBILE MISSILE TEL ANALYSIS

    Amount: $71,321.00

    THE PROPOSED PHASE I STUDY WILL FIRST DETERMINE THE ESSENTIAL ELEMENTS OF INFORMATION FOR MOBILE MISSILE VEHICLE ANALYSIS. OBJECTIVES FOR PHASE I ARE 1) DEFINE AN INNOVATIVE METHODOLOGY FOR MAKING ACC ...

    SBIR Phase I 1987 Air ForceDepartment of DefenseDepartment of Defense
  7. SURVEILLANCE INFORMATION ON CYCLE TIME ON SMALL MOBILE SYSTEMS ASSESSMENT

    Amount: $464,000.00

    SMALL MOBILE MISSILE SYSTEM CONCEPT VIABILITY IS DEPENDENT ON DENIAL OF ACCURATE TARGETING INFORMATION TO THE AGRESSOR. RELOCATION TIMES MUST BE LESS THAN THE AGRESSOR'S SURVEILLANCE/TARGETING CYCLE T ...

    SBIR Phase II 1986 Air ForceDepartment of DefenseDepartment of Defense
  8. (INFECT)

    Amount: $66,163.00

    THE SMALL MOBILE SYSTEM (CSMS) ICBM SURVIVABILITY DEPENDS UPON ITS RELOCATION TIME BEING LESS THAN THE SOVIET INTELLIGENCE AND FORCE EMPLOYMENT TIME (INFECT). THIS STUDY ANALYZES THE MAJOR INFECT COMP ...

    SBIR Phase I 1986 Air ForceDepartment of DefenseDepartment of Defense
  9. RV TERMINAL UPDATE

    Amount: $74,971.00

    N/A

    SBIR Phase I 1986 Air ForceDepartment of DefenseDepartment of Defense
  10. SPECIFICATION OF EXPERT SYSTEMS FOR THE AFSCF

    Amount: $69,040.00

    N/A

    SBIR Phase I 1986 Air ForceDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government