BEACON POWER CORP.

Basic Information

65 Middlesex Road
Tyngsboro, MA, 01879-2041

Company Profile

n/a

Additional Details

Field Value
DUNS: 8260445
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 27


  1. Development of a High-power Motor/Generator for the ARPA-E Hub-Less Flywheel

    Amount: $929,458.00

    Recognizing the advantages of energy storage flywheels in rapid-response, high cycle-life applications, ARPA-E has funded Beacon Power to develop critical components for a low cost flying ring hub-les ...

    SBIR Phase II 2012 Department of Energy
  2. Development of a High-power Motor/Generator for the ARPA-E Hub-Less Flywheel

    Amount: $146,081.00

    Recognizing the advantages of flywheels in rapid-response, high cycle-life applications, ARPA-E has funded Beacon Power to develop critical components for a low cost flying ring hub-less flywheel unde ...

    SBIR Phase I 2011 Department of Energy
  3. Extreme Energy Density Flywheel Energy Storage System for Space Applications

    Amount: $750,000.00

    The overall objective of the proposed program is to develop the preliminary design for the highest-possible energy-density flywheel energy storage system within the given constraints. This Phase II p ...

    SBIR Phase II 2005 Defense Advanced Research Projects Agency Department of Defense
  4. Optimization of Flywheel Energy Density Utilizing a Composite Hub

    Amount: $98,086.00

    The proposal objective is to develop a flywheel energy storage system capable of achieving its maximum theoretical specific energy density, while being capable of repeated high peak-power demands. Th ...

    SBIR Phase I 2004 Defense Advanced Research Projects Agency Department of Defense
  5. Development of a Low Cost Flywheel Energy Storage System Suitable for Low Temperature Operation

    Amount: $98,793.00

    N/A

    SBIR Phase I 1999 National Science Foundation

Agency Micro-sites

US Flag An Official Website of the United States Government