5-D Systems Inc.

Basic Information

1 Chisholm Trail, Suite 3200
Round Rock, TX, 78681-5002

http://www.5dsystems.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 90213369
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 30


  1. Minimized Space, Weight and Power Network Architecture Solution

    Amount: $79,919.00

    The E-2D and other airborne, network-enabled platforms represent a significant capability in terms of data fusion, command & control, and cooperative engagement. This effort seeks to develop an intell ...

    SBIR Phase I 2015 Department of Defense Navy
  2. Expand Data Transfer Rates within Legacy Aircraft (ERLA)

    Amount: $147,384.00

    ABSTRACT: The intercommunication data rate (IDR) of legacy aircraft is a limiting factor for transferring data between positions on the platform. Future planned capabilities, like the Advanced Tacti ...

    SBIR Phase I 2014 Air Force Department of Defense
  3. Militarized Power Line Communication

    Amount: $572,900.00

    Significant energy is required to operate and maintain the extensive U.S. military mission around the world. This equates to significant costs to the country. Smart power microgrids have proven to sig ...

    SBIR Phase II 2014 Department of Defense Army
  4. Expand Data Transfer Rates within Legacy Aircraft (ERLA)

    Amount: $749,948.00

    ABSTRACT: 5-D Systems is developing a multi-channel, high bandwidth communication system for legacy platforms. Our compact, ruggedized Broadband On Aircraft-multi (BOAm) transceivers will interface ...

    SBIR Phase II 2014 Department of Defense Air Force
  5. Vision Processor for Helmet System (VPHS)

    Amount: $149,864.00

    ABSTRACT: 5-D Systems (5-D) has developed a concept for a state-of-the-art Vision Processor for Helmet Systems (VPHS) that will provide significant performance improvements over currently deployed sy ...

    SBIR Phase I 2013 Department of Defense Air Force
  6. Militarized Power Line Communication

    Amount: $149,990.00

    5-D is developing a cost effective, militarized, power line communications (PLC) system leveraging commercial"Smart Grid"and PLC technologies. Our approach provides the system components ne ...

    SBIR Phase I 2013 Department of Defense Navy
  7. Intelligent Adaptive Needs Characterization for M&S Systems Engineering

    Amount: $99,962.00

    5-D Systems and the University of Texas San Antonio (UTSA) Autonomous Control Engineering (ACE) Laboratory will prototype a system concept and produce a long term development plan for a tool to intell ...

    STTR Phase I 2012 Missile Defense Agency Department of Defense
  8. Automated Support System for the Development and Maintenance of TPSs

    Amount: $79,965.00

    Test Program Sets (TPS) within an Automatic Test System (ATS) represent a significant investment that must often be preserved during an obsolescence update to the ATS equipment. This effort seeks to d ...

    SBIR Phase I 2012 Department of Defense Navy
  9. High Speed Digital Video on Legacy Aircraft Wiring

    Amount: $694,621.00

    ABSTRACT: 5-D has developed an approach, leveraging modified commercial technology, to add a modern high speed network to legacy aircraft using only existing aircraft wiring. With this design impleme ...

    SBIR Phase II 2011 Department of Defense Air Force
  10. Software Architecture for Navigation Devices Enabling Flexible Addition of Aiding Sensors

    Amount: $98,512.00

    The Defense Advanced Research Projects Agency (DARPA) is seeking a software architecture that allows new and advanced navigation sensors to be integrated with an existing navigation system. To demonst ...

    SBIR Phase I 2010 Defense Advanced Research Projects Agency Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government