Vibration Analysis of Rotating Plant Machinery

Award Information
Agency:
Department of Defense
Amount:
$99,978.00
Program:
SBIR
Contract:
FA9101-08-M-0018
Solitcitation Year:
2007
Solicitation Number:
2007.3
Branch:
Air Force
Award Year:
2008
Phase:
Phase I
Agency Tracking Number:
F073-135-0095
Solicitation Topic Code:
AF073-135
Small Business Information
STREAMLINE AUTOMATION, LLC
3100 Fresh Way SW, Huntsville, AL, 35805
Hubzone Owned:
N
Woman Owned:
N
Socially and Economically Disadvantaged:
N
Duns:
124289294
Principal Investigator
 Alton Reich
 Project Manager / Partner
 (256) 713-1220
 Alton.Reich@StreamlineAutomation.bi
Business Contact
 Alton Reich
Title: Project Manager / Partner
Phone: (256) 713-1220
Email: Alton.Reich@StreamlineAutomation.bi
Research Institution
N/A
Abstract
The AEDC Engine Test Facility (ETF) has more than 20 test cells that can be used for testing prototype propulsion systems and components. A variety of rotating machinery, including compressors and pumps, is crucial to wind tunnel operations. The unplanned failure of a major component can have a major impact on testing schedules. As such, there is significant motivation to avoid unplanned outages caused by equipment failure, in particular failures that require significant time and effort to recover from. Therefore, AEDC requires a vibration-based machinery condition analysis system for plant rotating machinery that can provide early indication of machinery and bearing wear, and accurate predictions of time to failure that enable major maintenance operations to be planned well in advance. A vibration-based machinery condition analysis system will be developed using a combination of existing accelerometers and acoustic transducers. These enable high-frequency (several times rotational frequency) vibration information to be extracted. The captured data will be archived and used to develop trends over time. An expert system will be developed to analyze the data to screen out normal readings and to aid plant personnel in identifying areas of concern. The system will also be developed to estimate the time remaining until components will need to be replaced in order to allow planning of maintenance outages.

* information listed above is at the time of submission.

Agency Micro-sites

US Flag An Official Website of the United States Government