Long Life, Low Cost Mini-Roundabouts from Simple Modular Shapes and Recycled Material

Award Information
Agency: Department of Transportation
Branch: N/A
Contract: DTRT5716C10028
Agency Tracking Number: 142FH3004II
Amount: $750,000.00
Phase: Phase II
Program: SBIR
Solicitation Topic Code: 142FH3
Solicitation Number: DTRT5714RSBIR2
Timeline
Solicitation Year: 2014
Award Year: 2016
Award Start Date (Proposal Award Date): 2016-08-10
Award End Date (Contract End Date): 2018-08-10
Small Business Information
4 Constitution Road, Lexington, MA, 02421-6608
DUNS: 078789940
HUBZone Owned: N
Woman Owned: N
Socially and Economically Disadvantaged: N
Principal Investigator
 Jerome Fanucci
 President
 (781) 223-3045
 jerry@fanucci.me
Business Contact
 Jerome Fanucci
Title: President
Phone: (781) 223-3045
Email: jerry@fanucci.me
Research Institution
N/A
Abstract
In Phase I, ZKxKZ designed, developed and demonstrated an approach for fabrication and rapid installation of low cost modular mini-roundabouts made from recycled plastic boards. Phase 1 culminated in the demonstration of half-scale 24’ diameter roundabout’s center circle made with the recycled boards. The same material and modular construction approach can be applied to other roundabout features, such as splitter islands. Phase II will feature two major types of activity. Lab testing will be conducted to verify suitability of the recycled plastic boards and associated ground anchors for the roundabout application, with special tests created to evaluate durability and hold down features. The majority of Phase II work will center on identification of locations for prototype roundabout installations in cities around the country. ZKxKZ has already reached an agreement for the site of our first Phase II installation. It is expected that prototype roundabouts will be installed early enough in the program to allow the team to monitor the performance of the systems over a period of operational exposure, and use this data to adjust future designs for any observed shortcomings. The ultimate objective of Phase II will be establishment of a low cost mini-roundabout product suitable for commercial sale.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government