CARPENTER RESEARCH CORP.

Company Information
Address Po Box 2490, 27520 Hawthorne
Blvd., Suite 263
Rolling Hills Es, CA, 90274


Information

DUNS:

# of Employees: 3


Ownership Information

HUBZone Owned: N

Socially and Economically Disadvantaged: N

Woman Owned: N



Award Charts




Award Listing

  1. Efficient Digitization of Nuclear Fireball Film

    Amount: $87,926.00

    The objectives of the proposed work are to develop the technical feasibility and detailed requirements for new methods and technology to decrease, substantially, the cost and time required to digitize ...

    SBIRPhase I1998National Geospatial-Intelligence Agency Department of Defense
  2. Optical Time of Arrival Measurements

    Amount: $143,097.00

    THE ULTIMATE OBJECTIVE OF THE PROPOSED WORK IS TO PROVIDE THE GOVERNMENT WITH PROVEN MINIATURE PRESSURE INSTRUMENTATION FOR MEASURE DUSTY FLOW BOUNDARY LAYERS IN SMALL-SCALE HE, WINDTUNNEL, AND SHOCK ...

    SBIRPhase II1995Defense Threat Reduction Agency Department of Defense
  3. UNDERGROUND NUCLEAR TESTING: DIAMOND FORTUNE FREE-AIR CURVE

    Amount: $85,000.00

    A conceptually simple and potentially robust method is introduced and proposed for measuring accurately the free-air airblast curve for the Diamond Fortune UGT. If successful, a new technique will hav ...

    SBIRPhase I1992Defense Threat Reduction Agency Department of Defense
  4. Optical Time of Arrival Measurements

    Amount: $71,526.00

    N/A

    SBIRPhase I1992Defense Threat Reduction Agency Department of Defense
  5. 8-LB CHARGE HOB EXPERIMENT REPORT

    Amount: $53,924.00

    PHASE I PROPOSES TO GATHER THE DATA AND DISCRIPTIVE INFORMATION FOR A 28-SHOT SET OF EXPERIMENTS MADE IN THE EARLY 1970'S TO MEASURE HIGH OVERPRESSURE AIRBLAST FROM 8-LB CHARGES OF PBX-9404, TO PREPAR ...

    SBIRPhase I1991Defense Threat Reduction Agency Department of Defense
  6. FREE-AIR BLAST MEASUREMENTS FOR CAVITY UGT

    Amount: $65,691.00

    A PHASE I SBIR STUDY IS PROPOSED TO DETERMINE ANALYTICALLY THE FEASIBILITY OF MEASURING THE FREE-AIR (UNREFLECTED) AIRBLAST WAVEFORMS FROM A NUCLEAR BURST IN AN UNDERGROUND CAVITY. SUCH DATA WOULD BE ...

    SBIRPhase I1991Defense Threat Reduction Agency Department of Defense
  7. SNOB/GREG CALIBRATOR DEVELOPMENT

    Amount: $84,783.00

    THE OBJECTIVES OF THIS WORK ARE TO ESTABLISH THE DESIGN REQUIREMENTS, TECHNICAL FEASIBILITY A BASIC DESIGN, AND A COST DATA BASE FOR DESIGNING AND CONSTRUCTING A LOW COST BUT ADEQUATE CAPABILITY FOR C ...

    SBIRPhase I1987Defense Threat Reduction Agency Department of Defense

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government