  1. HREP HIGH RESOLUTION ELECTRONIC PHOTOGRAPHY

    Amount: $50,000.00

    WE PROPOSE TO DEVELOP A REUSABLE, PHOTOSENSITIVE PANEL TO CAPTURE IMAGES WHICH CAN BE USED TO PRODUCE HIGH RESOLUTION ELECTRONIC PHOTOGRAPHS. THE TECHNOLOGY INVOLVED PARALLELS THAT OF ZEROGRAPHY IN CO ...

    SBIR Phase I 1988 National Aeronautics and Space Administration
  2. POSITIONING BEAM RIDER MODULE FOR ARTICULATED ROBOT MANIPULATOR (ARM)

    Amount: $500,000.00

    THE ARTICULATED ROBOT MANIPULATOR (ARM) IS A LIGHTWEIGHT FLEXABLE ARM CAPABLE OF QUICKLY AND ACCURATELY POSITIONING ALOAD OF 100 KILOGRAMS OVER A TEN METER RADIUS. ARM WILL USEMIXED LASER AND BEAM POS ...

    SBIR Phase II 1987 National Aeronautics and Space Administration
  3. VOICE ACTIVATED INTERNALLY MOUNTED SPACESUIT HEAD-UP DISPLAY

    Amount: $55,470.00

    WE PROPOSE TO PROTOTYPE AN INTERNALLY MOUNTED FLAT PANEL COLOR LCD STEREO DISPLAY ASSEMBLY (SDA) TO SERVE AS A SPACE SUIT HEADS-UP DISPLAY (HUD), HELMET I. THE DISPLAY WILL BE CONNECTED TO OUR COMPUTE ...

    SBIR Phase I 1987 Air Force Department of Defense
  4. POSITIONING BEAM RIDER MODULE FOR ARTICULATED ROBOT MANIPULATOR (ARM)

    Amount: $50,000.00

    N/A

    SBIR Phase I 1985 National Aeronautics and Space Administration
  5. ASTRONAUTS IN SPACE LIVE IN AN ENCLOSED ECOLOGICAL LIFE SUPPORT SYSTEM WHERE THE NON-DIGESTIBLE FRACTION OF COMESTIBLE BIOMASS ACCUMULATES.

    Amount: $47,683.00

    ASTRONAUTS IN SPACE LIVE IN AN ENCLOSED ECOLOGICAL LIFE SUPPORT SYSTEM WHERE THE NON-DIGESTIBLE FRACTION OF COMESTIBLE BIOMASS ACCUMULATES. FOR SHORT DURATION MISSIONS, AN ASTRONAUT'S METABOLIC NEEDS ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  6. ELECTRIC POWER TRANSMISSION LINES SITED ABOVE GROUND REQUIREA CLEARED RIGHT OF WAY.

    Amount: $20,000.00

    ELECTRIC POWER TRANSMISSION LINES SITED ABOVE GROUND REQUIREA CLEARED RIGHT OF WAY. WHEN THE RIGHT OF WAY TRANSITS WOODED AREAS SAFE OPERATION REQUIRES THE REMOVAL OF FOLIAGE INTRUDING INTO THE RIGHT ...

    SBIR Phase I 1983 Department of Energy