You are here

CHARLES RIVER ANALYTICS, INC.

Company Information
Address
625 MOUNT AUBURN ST
CAMBRIDGE, MA 02138-4555
United States


http://www.cra.com

Information

UEI: DD1BYN8SN355

# of Employees: 156


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No




Success Stories

  1. SBIR-STTR Success: Charles River Analytics

    A Massachusetts-based company is building a virtual aircraft maintenance trainer for the Air Force that would allow for larger class sizes and troubleshooting scenarios that are difficult to present in a traditional live setting.With support from the Air Force Small Business Innovation Research/...
  2. SBIR-STTR-Success: Charles River Analytics

    Cyber security and defense are dominating the national headlines, and for good reason. With more and more classified data and military secrets housed online, the U.S. government continually seeks solutions on how to best protect this information. Charles River Analytics, a small business based in...

Award Charts




Award Listing

  1. SYSTEM

    Amount: $50,000.00

    MICROWAVE LANDING SYSTEM WILL INCREASE THE SAFETY OF TERMINAL AREA NAVIGATION, AND THE EFFICIENCY OF AIRSPACE UTILIZATION AT CONGESTED AIRPORTS WITH THE USE OF NAVIGATIONSYSTEMS BLENDING MLS POSITION ...

    SBIRPhase I1986Department of Transportation
  2. THE PRIMARY OBJECTIVE OF THIS STUDY IS TO EVALUATE THE FEASIBILITY OF DEVELOPING A REAL-TIME 3-D DYNAMIC ROBOT VISION SYSTEM FOR USE STS ASSEMBLY, CONSTRUCTION, AND ROUTINE MAINTENANCE.

    Amount: $49,927.00

    THE PRIMARY OBJECTIVE OF THIS STUDY IS TO EVALUATE THE FEASIBILITY OF DEVELOPING A REAL-TIME 3-D DYNAMIC ROBOT VISION SYSTEM FOR USE STS ASSEMBLY, CONSTRUCTION, AND ROUTINE MAINTENANCE. THE BASIC TECH ...

    SBIRPhase I1985National Aeronautics and Space Administration
  3. MODEL-BASED METHODOLOGY FOR TERRAIN-FOLLOWING DISPLAY DESIGN

    Amount: $49,962.00

    N/A

    SBIRPhase I1985Department of Defense Air Force
  4. THE PRIMARY OBJECTIVE OF THE PHASE I EFFORT IS TO EVALUATE THE FEASIBILITY OF DEVELOPING AN ON-BOARD FLOW-FIELD PASSIVE RANGING SYSTEM FOR USE IN TACTICAL MISSILE GUIDANCE.

    Amount: $49,000.00

    THE PRIMARY OBJECTIVE OF THE PHASE I EFFORT IS TO EVALUATE THE FEASIBILITY OF DEVELOPING AN ON-BOARD FLOW-FIELD PASSIVE RANGING SYSTEM FOR USE IN TACTICAL MISSILE GUIDANCE. THE BASIC TECHNIQUE PROPOSE ...

    SBIRPhase I1984Department of Defense Army
US Flag An Official Website of the United States Government