Cim Systems, Inc.

Basic Information

2425 N. Central Expressway,
Suite 432
Richardson, TX, 75080

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 16


  1. INTEGRATION OF EXPERT SYSTEM FOR PROCESS PLANNING AND FEATURE BASED DESIGNS

    Amount: $49,798.00

    ARTIFICIAL INTELLIGENCE/EXPERT SYSTEM TECHNIQUES HAVE DEMONSTRATED THE ABILITY TO ADDRESS COMPLEX REASONING TASKS REQUIRED FOR PROCESS PLANNING. FEATURE-BASED DESIGN THEORY AND PRELIMINARY EFFORTS HAV ...

    SBIR Phase I 1992 Defense Advanced Research Projects Agency Department of Defense
  2. CONCURRENT ENGINEERING

    Amount: $49,482.00

    A CONCURRENT ENGINEERING METHODOLOGY FOR THE DESIGN OF ELECTRONIC PRODUCTS, PROCESSES AND THE PRODUCT LIFE-CYCLE, IS NEEDED. CONCURRENT ENGINEERING IS THE SIMULTANEOUS, INTERACTIVE, CROSS DISCIPLINARY ...

    SBIR Phase I 1991 Air Force Department of Defense
  3. INTELLIGENT KNOWLEDGE-BASED CAD FOR PRODUCIBILITY

    Amount: $525,923.00

    INNOVATIVE RESEARCH IS NEEDED TO ADDRESS THE PROBLEM OF DESIGNING FOR PRODUCIBILITY. KNOWLEDGE BASED SYSTEMS NOW OFFER CONSIDERABLE PROMISE IN THIS FIELD. IF THE GROUND DATA FOR THE INFERENCES OF SUCH ...

    SBIR Phase II 1989 Army Department of Defense
  4. DESIGN FOR PRODUCIBILITY TOOLS FOR ELECTRONIC SYSTEMS

    Amount: $160,000.00

    THIS PROJECT IS TO DEVELOP A SET OF DESIGN-FOR-PRODUCIBILITY (DFP) TOOLS AND GUIDELINES FOR ELECTRONIC SYSTEMS. THE GUIDELINES WILL COVER ALL LEVELS OF ELECTRONIC SYSTEM INTERCONNECTION: BASE MATERIAL ...

    SBIR Phase II 1989 Air Force Department of Defense
  5. EXPERT SYSTEM FOR CIRCUIT BOARD ASSEMBLY

    Amount: $49,975.00

    THE PROPOSED EXPERT SYSTEM FOR CIRCUIT BOARD ASSEMBLY IS AN ENGINEERING SOFTWARE TOOL WHOSE GOAL IS TO HELP AN ORGANIZATION TO OPTIMIZE THE PLACEMENT AND INSERTION SEQUENCE OF ELECTRONIC PART COMPONEN ...

    SBIR Phase I 1989 Navy Department of Defense
  6. DESIGN COMPLIANCE ASSESSMENT TOOL (DCAT) FOR ELECTRONIC SYSTEMS

    Amount: $49,996.00

    MOVING FROM PROTOTYPE TO PRODUCTION DESIGN IS NOT ALWAYS A SMOOTH TRANSITION. INTERACTIONS BETWEEN PARTS CAN SURFACE THAT WERE PREVIOUSLY UNNOTICEABLE BUT ARE NOW WORRISOME OR EVEN FATAL TO THE GOAL O ...

    SBIR Phase I 1989 Air Force Department of Defense
  7. DESIGN PRODUCIBILITY ASSESSMENT SYSTEM

    Amount: $49,928.00

    CURRENT DESIGN PRODUCIBILITY ENGINEERING RELIES ON THE USE OF CHECKLISTS AND THE EXPERIENCE OF THE DESIGNER AND THE MANUFACTURING ENGINEER TO INTEGRATE MANUFACTURING REQUIREMENTS INTO THE OVERALL DESI ...

    SBIR Phase I 1988 Air Force Department of Defense
  8. DESIGN FOR PRODUCIBILITY TOOLS FOR ELECTRONIC SYSTEMS

    Amount: $49,928.00

    N/A

    SBIR Phase I 1988 Air Force Department of Defense
  9. OPTIMUM CONCURRENT FLOW ROUTING IN A DYNAMIC NETWORK

    Amount: $500,000.00

    THE EMERGENCE OF ARTIFICAL INTELLIGENCE AND EXPERT SYSTEMS TECHNOLOGY FROM THE LABORATORY ENVIRONMENT INTO GENERAL PRACTICE OFFERS A PROMISING APPROACH FOR THE DEVELOPMENT OF MANUFACTURING APPLICATION ...

    SBIR Phase II 1987 Navy Department of Defense
  10. INTELLIGENT KNOWLEDGE-BASED CAD FOR PRODUCIBILITY

    Amount: $49,900.00

    N/A

    SBIR Phase I 1987 Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government