Coleman Research Corp.

Basic Information

5950 Lakehurst Drive
Orlando, FL, 32819

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. Advanced, Coherent Laser-Radar System Components

    Amount: $49,956.00

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  2. INDIRECT FIRE WEAPON SIMULATON

    Amount: $479,098.00

    THE OBJECTIVE OF OUR PHASE I EFFORT IS TO EXPLORE TECHNIQUES, AND DEVELOP APPROACHES TO PROVIDE SAFE REAL-TIME AUDIOVISUAL CUES FOR THE INBOUND AND IMPACT NOISES, CONCUSSION, DEBRIS, FLASH (NIGHT VISI ...

    SBIR Phase II 1993 ArmyDepartment of DefenseDepartment of Defense
  3. APPLICATION OF MODEL-BASED PREDICTIVE CONTROL TO FOSSIL POWER PLANTS

    Amount: $249,988.00

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS DEVELOPMENT OF PRACTICAL, MULTIVARIATE MODEL PREDICTIVE CONTROL (MPC) FOR FOSSIL POWER PLANTS. THE APPROACH USED HERE INVOLVES THE DEVELOPMENT OF A GENERIC, R ...

    SBIR Phase II 1992 National Science Foundation
  4. Adaptive Attitude Control System for Space-Based Interceptor

    Amount: $48,894.00

    An adaptive attitude control system for a space-based interceptor will ameliorate the effects of torque disturbances when firing a divert thruster with the line of force offset from its center of mass ...

    SBIR Phase I 1992 Missile Defense AgencyDepartment of DefenseDepartment of Defense
  5. Kinetic Energy Weapon Guidance Utilizing Fuzzy Logic

    Amount: $50,156.00

    Conventional guidance algorithms for exoatmospheric kinetic energy weapons are based on algorithms developed for endoatmospheric missile systems. With the appropriate assumptions and definitions, the ...

    SBIR Phase I 1992 Missile Defense AgencyDepartment of DefenseDepartment of Defense
  6. Time-Dependent Assignment Using a Neural Network

    Amount: $50,579.00

    The assignment problem is a linear programming problem in which the goal is to determine the assignment of sources to destinations so as to minimize the cost. This arises in numerous areas, including ...

    SBIR Phase I 1992 Missile Defense AgencyDepartment of DefenseDepartment of Defense
  7. INDIRECT FIRE WEAPON SIMULATON

    Amount: $48,488.00

    N/A

    SBIR Phase I 1992 ArmyDepartment of DefenseDepartment of Defense
  8. SIMPLIFIED AUTO CRASH MEASURING USING A PORTABLE INTEGRATED LASER RADAR/CAMCORDER

    Amount: $50,000.00

    DIGITAL SIGNAL CORPORATION PROPOSES TO REPLACE THE CURRENT VEHICLE CRUSH MEASUREMENT SYSTEM OF HIGHLY TRAINED INVESTIGATORS USING TIME CONSUMING METHODS WITH A PORTABLE, RUGGED, EASY TO USE LASER RADA ...

    SBIR Phase I 1991 Department of Transportation
  9. APPLICATION OF MODEL-BASED PREDICTIVE CONTROL TO FOSSIL POWER PLANTS

    Amount: $49,950.00

    N/A

    SBIR Phase I 1991 National Science Foundation
  10. HARDENED ELECTRONICS FOR ELECTROMAGNETICALLY LAUNCHED PROJECTILES

    Amount: $298,000.00

    THE ELECTRONICS DESIGN PROBLEM ASSOCIATED WITH ULTRA-HIGH G PHYSICAL ENVIRONMENTS IS BEING ADDRESSED, USING AS A BASIS THE DEVELOPMENT OF CRYTALS FOR USE IN CRYSTAL OSCILLATORS SUITABLE FOR ELECTROMAG ...

    SBIR Phase II 1990 Missile Defense AgencyDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government