Cryogenic Applications F, Inc.

Company Information

Company Name
Cryogenic Applications F, Inc.
Address
450 Bacon Springs Lane
Clinton, TN, 37716
Phone
1 865-435-5433
URL
n/a
DUNS
189058852
Number of Employees
3

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$373,732.00
6
SBIR Phase II
$2,744,290.00
4
STTR Phase I
$199,874.00
2
STTR Phase II
$1,249,148.00
2
Chart code to be here

Award List

  1. CONTINUOUS CRYOSORPTION VACCUM PUMPING FOR FUSION APPLICA- TIONS

    Amount: $50,000.00

    FUSION ENERGY POWER REACTORS WILL REQUIRE HIGH SPEED VACUUM PUMPS TO EXHAUST REACTION PRODUCTS FROM THE PLASMA. CRYOGENIC PUMPS, WHICH FREEZE GASES ON A LOW TEMPERATURE SURFACE, ARE POTENTIALLY VERY A ...

    SBIR Phase I 1988 Department of Energy
  2. AN ARGON-FROST CONTINUOUS CRYOPUMP FOR FUSION APPLICATIONS

    Amount: $498,900.00

    FUSION REACTORS BASED ON THE MAGNETIC CONFINEMENT OF PLASMASWILL REQUIRE HIGH SPEED PUMPING OF HELIUM, DEUTERIUM, AND TRITIUM AT HIGH THROUGHPUT WHILE LIMITING THE INVENTORY OF TRITIUM IN THE PUMPS TO ...

    SBIR Phase II 1992 Department of Energy
  3. A CONTINUOUS CRYOPUMP/PELLET-FABRICATION APPARATUS FOR FUSION

    Amount: $748,826.00

    FUSION REACTORS BASED ON THE MAGNETIC CONFINEMENT OF PLASMAS WILL REQUIRE ACTIVE FUELING TO REPLENISH THE DEUTERIUM/TRITIUM ESCAPING THE PLASMA. CRYOGENIC PUMPS AND FROZEN PELLET INJECTION ARE THE MO ...

    SBIR Phase II 1995 Department of Energy
  4. A Continuous Low-Inventory Tritium Fuel Cycle for Fusion

    Amount: $99,999.00

    A Continuous Low-Inventory Tritium Fuel Cycle for Fusion DOE Grant No. DE-FG02-98ER86075 Amount: $99,999 Small Business Cryogenic Applications F, Inc. 450 Bacon Springs Lane Clinton, TN 37716-531 ...

    STTR Phase I 1998 Department of Energy
  5. N/A

    Amount: $499,998.00

    N/A

    STTR Phase II 1999 Department of Energy
  6. N/A

    Amount: $0.00

    N/A

    SBIR Phase I 2000 Department of Energy
  7. N/A

    Amount: $749,812.00

    N/A

    SBIR Phase II 2000 Department of Energy
  8. An Advanced Cold Moderator Using Solid Methane Pellets

    Amount: $99,978.00

    Not Available AEPTEC proposes to provide a COMMON TACTICAL 3D PICTURE to all surface combatants operating in a battle group, by implementing advanced connectivity technologies that will support the s ...

    SBIR Phase I 1999 Department of Energy
  9. Transport of Methane Pellets for Advanced Cold Moderators

    Amount: $99,125.00

    73071S03-I Existing and planned neutron facilities, such as the Spallation Neutron Source, generate pulses of cold neutrons for materials research. The efficiency of the beam line components, which ...

    SBIR Phase I 2003 Department of Energy
  10. Transport of Methane Pellets for Advanced Cold Moderators

    Amount: $746,752.00

    73071-Existing and planned neutron facilities, such as the Spallation Neutron Source, generate pulses of cold neutrons for materials research. The efficiency of the beam line components, which conver ...

    SBIR Phase II 2004 Department of Energy

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government