Daina

Company Information

Company Name
Daina
Address
4960 Fillmore Street, N.e.
Columbia Heights, MN, 55421
Phone
n/a
URL
n/a
DUNS
n/a
Number of Employees
2

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$268,938.00
6
SBIR Phase II
$228,556.00
1
Chart code to be here

Award List

  1. MICROCOMPUTER SYSTEMS HAVE THE POTENTIAL OF AIDING THE OPERATIONS RESEARCH PROFESSIONALS ENGAGED IN LOGISTICS APPLICATION IN THE NAVY AND IN OTHER MILITARY, GOVERNMENT AND COMMERCIAL OPERATIONS.

    Amount: $38,282.00

    MICROCOMPUTER SYSTEMS HAVE THE POTENTIAL OF AIDING THE OPERATIONS RESEARCH PROFESSIONALS ENGAGED IN LOGISTICS APPLICATION IN THE NAVY AND IN OTHER MILITARY, GOVERNMENT AND COMMERCIAL OPERATIONS. THE C ...

    SBIR Phase I 1985 NavyDepartment of Defense
  2. INTELLIGENT BUILT-IN-TEST MODULE

    Amount: $46,098.00

    FUTURE MILITARY AVIONICS SYSTEMS WILL BE DEPENDING MORE ON BUILT-INTEST (BIT) FOR FAULT DETECTION AND ISOLATION TO MEET STRINGENT RELIABILITY, MAINTAINABILITY, AND SUPPORTABILITY GOALS. RECENT EXPERIE ...

    SBIR Phase I 1988 NavyDepartment of Defense
  3. MISSION RELIABILITY MODEL (MIREM) ENGINEERING WORKSTATION

    Amount: $43,913.00

    THE COMPLEXITY OF THE NEXT-GENERATION FAULT-TOLERANT ELECTRONIC SYSTEM DESIGN TASKS WILL REQUIRE INTERACTIVE ACCESS TO THE RELIABILITYPREDICTION TOOLS IN ORDER TO ACHIEVE THE DESIRED RELIABILITY GOALS ...

    SBIR Phase I 1988 Air ForceDepartment of Defense
  4. FAIL-SAFE FAULT-TOLERANT ELECTRONICS

    Amount: $228,556.00

    FUTURE MILITARY AVIONICS SYSTEMS WILL REQUIRE AT LEAST AN ORDER OF MAGNITUDE IMPROVEMENT IN MEAN TIME BETWEEN CRITICAL FAILURES. TO ACHIEVE THIS GOAL INNOVATIVE FAIL-SAFE FAULT-TOLERANT ELECTRONIC SYS ...

    SBIR Phase II 1990 Air ForceDepartment of Defense
  5. HIGH-SPEED, LOW-COST WORKSTATION FOR COMPUTATION-INTENSIVE STATISTICS

    Amount: $44,806.00

    THERE IS A GROWING NATIONAL NEED TO PROVIDE RESEARCHERS WITHHIGH-SPEED AND COST-EFFECTIVE COMPUTERS CAPABLE OF HANDLING COMPUTATION-INTENSIVE STATISTICAL AND FORECASTING PROBLEMS. EXAMPLES OF SUCH STA ...

    SBIR Phase I 1990 National Science Foundation
  6. Advanced Design Tools for Evaluating Fault-Tolerant Systems

    Amount: $50,000.00

    As mission critical avionics systems increase in complexity, the evaluation of their performance and reliability will become more difficult. We propose to select and to integrate a group of reliabilit ...

    SBIR Phase I 1993 ArmyDepartment of Defense
  7. FAIL-SAFE FAULT-TOLERANT ELECTRONICS

    Amount: $45,839.00

    N/A

    SBIR Phase I 1988 Air ForceDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government