REL, Inc.

Basic Information

57640 North Eleventh Street
Calumet, MI, 49913-3118

http://www.relinc.net

Company Profile

n/a

Additional Details

Field Value
DUNS: 829921134
Hubzone Owned: Y
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 36


  1. SBIR Phase I: Metal Matrix Composite Diamond Blades

    Amount: $150,000.00

    This Small Business Innovation Research (SBIR) Phase I project will develop a metal matrix composite concrete cutting diamond blade. This project has the potential to address a distinct need in a $2 b ...

    SBIR Phase I 2014 National Science Foundation
  2. Field Effects for Processing of Ultralightweight Materials with Superior Properties

    Amount: $100,000.00

    Electromagnetic Fields (EMF) have been used in conjunction with commercial DC casting of ingots. This project will utilize the the EMF fields in with squeeze casting to demonstrate the ability to refi ...

    SBIR Phase I 2014 Department of Defense Army
  3. SBIR Phase II: Development of a Selectively Reinforced Aluminum Composite Brake Rotor

    Amount: $487,836.00

    This Small Business Innovation Research (SBIR) Phase II project is focused on developing a one-piece functionally graded hybrid (fiber/particle) reinforced aluminum alloy matrix automobile brake rotor ...

    SBIR Phase II 2013 National Science Foundation
  4. SBIR Phase I: Development of a Selectively Reinforced Aluminum Composite Brake Rotor

    Amount: $149,856.00

    This Small Business Innovation Research Phase I project is focused on developing a one-piece functionally graded hybrid (fiber/particle) reinforced aluminum alloy matrix automobile brake rotor. Compos ...

    SBIR Phase I 2012 National Science Foundation
  5. Cast Encapsulation of Unfinished Ceramic Armor Tiles

    Amount: $472,859.00

    REL has demonstrated that Squeeze Casting a is viable process for encapsulation of ceramic tiles for Warfighter protection systems. The SBIR Phase 1 has demonstrated that squeeze cast encapsulation ca ...

    SBIR Phase II 2012 Department of Defense Army
  6. Cast Encapsulation of Unfinished Ceramic Armor Tiles

    Amount: $120,000.00

    Presently, the Army experiences numerous problems with existing manufacturing processes for the metal encapsulation of ceramic tiles within the current inventory of armor solutions. REL, Inc. will ad ...

    SBIR Phase I 2010 Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government