OVERCOMING LOST CIRCULATION PROBLEMS IN GEOTHERMAL DRILLING.

Award Information
Agency:
Department of Energy
Branch
n/a
Amount:
$50,000.00
Award Year:
1984
Program:
SBIR
Phase:
Phase I
Contract:
n/a
Agency Tracking Number:
1234
Solicitation Year:
n/a
Solicitation Topic Code:
n/a
Solicitation Number:
n/a
Small Business Information
Eaton Industries Of Houston
1980 Post Oak Blvd,#2000, Houston, TX, 77056
Hubzone Owned:
N
Socially and Economically Disadvantaged:
N
Woman Owned:
N
Duns:
n/a
Principal Investigator:
DR. B.A. EATON
PRESIDENT
() -
Business Contact:
() -
Research Institution:
n/a
Abstract
CURRENTLY GEOTHERMAL DRILLING METHODS ARE EXTREMELY EXPENSIVE DUE TO MASSIVE ROCK FRACTURES CAUSING COMPLETE LOSS OF CIRCULATION, THE HARD NATURE OF THE ROCKS AND HIGH TEMPERATURES. THIS PROPOSAL PRESENTS A METHOD TO ATTACK THESE PROBLEMS UTILIZING STATE OF THE ART DRILLING AND PRODUCTION TOOLS. THESE TOOLS ARE DESIGNED TO ALLOW EMPLACEMENT OF CASING WHILE DRILLING USING A CONCENTRIC DUAL DRILLING STRING TECHNIQUE. THIS TECHNIQUE ALSO INCORPORATES THE USE OF A RETRIEVABLE DRAG BIT WITH THE GENERAL ELECTRIC TYPE SYNTHETIC DIAMONDS FOR LONGER LIFE AND FASTER PENETRATION. LOST CIRCULATION ZONES WILL BE DRILLED WITH THEIR OWN FLUID. CONSTANT CIRCULATION OF THE HOLE CAN BE MAINTAINED FOR COOLING PURPOSES. THE CASING CAN BE CEMENTED IN A NORMAL INNER STRING MANNER AND CIRCULATION MAINTAINED INSIDE THE CASING WHILE THE CEMENT IS SETTING UP. THE ENTIRE TECHNIQUE WILL ALLOW CHEAPER, DEEPER, AND SAFER GEOTHERMAL WELLS.

* information listed above is at the time of submission.

Agency Micro-sites

US Flag An Official Website of the United States Government