Ei International Inc.

Basic Information

Po Box 736
Idaho Falls, ID, 83405

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    Amount: $343,974.00

    THIS PROJECT WILL ANALYZE AND PREPARE THE CONCEPTUAL DESIGN FOR A DIGITAL FEEDWATER CONTROL SYSTEM FOR A COMMERCIAL LIGHT WATER REACTOR POWERPLANT. THE CONTROL SYSTEM WILL FEATURE SENSOR VALIDATION AN ...

    SBIR Phase II 1989 Department of Energy
  2. A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER

    Amount: $50,000.00

    IT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPA ...

    SBIR Phase I 1988 Department of Energy
  3. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    Amount: $50,000.00

    N/A

    SBIR Phase I 1988 Department of Energy
  4. ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB).

    Amount: $49,680.00

    ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB). THE REQUIRED INFORMATION INCLUDES GEOMETRIC AND OPERATING DATA FOR THE PR ...

    SBIR Phase I 1984 Nuclear Regulatory Commission