ENERTECHNIX, INC.

Basic Information

23616 SE 225TH ST
Maple Valley, WA, 98038-0000

http://www.enertechnix.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 928928803
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 25


  1. ADVANCED CONTROL SYSTEM FOR BIOMASS COMBUSTION

    Amount: $449,980.00

    Combustion of biomass, especially in small-scale applications, produces high emissions of particulate matter (PM) that have been linked to adverse health effects and global climate change. Current ind ...

    SBIR Phase II 2014 Department of Agriculture
  2. Advanced Control System for Biofuel Combustion

    Amount: $99,947.00

    Combustion of biomass, especially in small-scale applications, produces high emissions of particulate matter (PM) that have been linked to adverse health effects and global climate change. Current ind ...

    SBIR Phase I 2013 Department of Agriculture
  3. A Personal Monitor for Space- and Time-Resolved Measurements of Aerosol Exposure

    Amount: $889,546.00

    DESCRIPTION (provided by applicant): The proposed project will develop and demonstrate a miniaturized, portable aerosol sampler that will collect a series of time- and location-resolved personal expos ...

    SBIR Phase II 2012 Department of Health and Human Services
  4. Real-time Threshold Exposure Monitor for Particulate Matter and Volatile Organic

    Amount: $144,394.00

    DESCRIPTION (provided by applicant): This Phase I project will evaluate the feasibility of developing an exposure monitor for particles in the PM2.5 and PM10 size ranges, and for volatile organic comp ...

    SBIR Phase I 2011 Department of Health and Human Services
  5. A Personal Monitor for Space- and Time-Resolved Measurements of Aerosol Exposure

    Amount: $150,000.00

    DESCRIPTION (provided by applicant): The proposed project will develop and demonstrate a miniaturized, portable aerosol sampler that will collect a series of time- and location-resolved personal expos ...

    SBIR Phase I 2011 Department of Health and Human Services
  6. Recovery Act- Terahertz Imaging in Kraft Recovery Boilers

    Amount: $149,950.00

    Recovery boilers are a key component of all Kraft pulp mills and are the production bottleneck in most such mills. Formation of deposits on the outside of heat transfer tubes can cause plugging of the ...

    SBIR Phase I 2010 Department of Energy
  7. Recovery Act- Terahertz Imaging in Kraft Recovery Boilers

    Amount: $999,995.00

    Recovery boilers are a key component of all kraft pulp mills and are often the production bottleneck in such mills. Formation of deposits on the outside of heat transfer tubes can cause plugging of th ...

    SBIR Phase II 2010 Department of Energy
  8. Sampling System for Trace Explosive Particles and Vapors

    Amount: $749,977.00

    Enertechnix proposes to develop a sampling system for trace explosive particles and vapors for vehicle-borne improvised explosive device (VBIED) detection and related applications. Our approach combin ...

    SBIR Phase II 2009 Department of Homeland Security
  9. Detection of Fine Aerosols Using a Novel Aerosol Sampler

    Amount: $100,036.00

    DESCRIPTION (provided by applicant): The goal of the proposed research is to develop a personal exposure monitor for indoor and outdoor particulate matter in the ultrafine to 10 micron size range. The ...

    SBIR Phase I 2009 Department of Health and Human Services
  10. Trace Explosives Particle and Vapor Sample Collection System Using Concentration of Scavenger Particles

    Amount: $99,981.00

    Enertechnix proposes to adapt its novel aerodynamic lens aerosol concentration technology to provide high flow rate, high efficiency sampling of particles and vapors for use in the detection of Vehicl ...

    SBIR Phase I 2008 Department of Homeland Security

Agency Micro-sites

US Flag An Official Website of the United States Government