Omitron, Incorporated

Company Information
Address 7051 Muirkirk Meadows Dv.; Suite A
Beltsville, MD, -

http://www.omitron.com

Information

DUNS: 108990649

# of Employees: 65


Ownership Information

Hubzone Owned: N

Socially and Economically Disadvantaged: N

Woman Owned: N



Award Charts




Award Listing

  1. Time series prediction for satellite ballistic coefficients

    Amount: $705,399.00

    ABSTRACT: The leading errors in computing future positions of satellites in Low Earth Orbit are generally due to inaccuracies in the thermospheric density and the prediction thereof. The use of Dynam ...

    STTRPhase II2013Department of Defense Air Force
  2. Innovative Earth Gravity Reformulation and Numerical Integration for Responsive SSA

    Amount: $524,587.00

    ABSTRACT: Computation of the geopotential acceleration and its partial derivatives per the standard formulation consumes considerable numerical integration time in special perturbations (SP) applicat ...

    STTRPhase II2012Air Force Department of Defense
  3. Time series prediction for satellite ballistic coefficients

    Amount: $98,844.00

    ABSTRACT: The leading errors in computing future positions of satellites in Low Earth Orbit (LEO) are generally due to inaccuracies in the thermospheric density and the prediction thereof. The use of ...

    STTRPhase I2011Air Force Department of Defense
  4. Innovative Earth Gravity Reformulation and Numerical Integration for Responsive SSA

    Amount: $87,486.00

    Currently, computation of the geopotential acceleration and its partial derivatives consumes a large portion of numerical integration time in special perturbations (SP) applications. The standard geo ...

    STTRPhase I2010Air Force Department of Defense
  5. Data Mining Development for OCS/DCS SSA Operations

    Amount: $81,590.00

    In the space domain, operators are faced with unmanageably large amounts of ambiguous data. The challenge, given manpower and time constraints, is using this data for situational awareness, space Com ...

    SBIRPhase I2010Air Force Department of Defense
  6. SPACECRAFT SUPERCOMPUTER

    Amount: $492,899.00

    THIS PROJECT WILL DEVELOP A SPACECRAFT SUPERCOMPUTER (SSC) FOR FUTURE NASA MISSIONS. THE SSC WOULD HAVE COMPUTATIONAL CAPABILITIES AT LEAST AN ORDER OF MAGNITUDE GREATER THAN CURRENT FLIGHT ARCHITECTU ...

    SBIRPhase II1992National Aeronautics and Space Administration
  7. USCG PV POWER SUPPLY

    Amount: $49,968.00

    THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY PHOTOVOLTAIC POWER SUPPLY DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES W ...

    SBIRPhase I1991Department of Transportation
  8. USCG BUOY STATUS MONITOR

    Amount: $49,667.00

    THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY STATUS MONITOR AND REPORTING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM IN ...

    SBIRPhase I1991Department of Transportation
  9. USCG BUOY POSITION MONITOR

    Amount: $49,989.00

    THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY POSITION MONITORING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES ...

    SBIRPhase I1991Department of Transportation
  10. SPACECRAFT SUPERCOMPUTER

    Amount: $49,848.00

    N/A

    SBIRPhase I1991National Aeronautics and Space Administration

Agency Micro-sites

US Flag An Official Website of the United States Government