EUCLID TECHLABS, LLC

Basic Information

5900 HARPER RD STE 102
SOLON, OH, 44139-1866

http://www.euclidtechlabs.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 141568639
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 18


  1. Flat Field Emitter Based on Ultrananocrystalline Diamond (UNCD) Film for SRF Technology

    Amount: $149,839.00

    Statement of the problem: Finding simple solutions to electron injection into superconducting radio frequency (SRF) accelerators is a long standing problem. While energies of 30-50 MeV are achievable ...

    SBIR Phase I 2015 Department of Energy
  2. GHz Electron Buncher Compatible with Commercial TEMs for Stroboscopic Imaging with Space-Time Resolution between 10-23 and 10-20 ms

    Amount: $149,909.00

    Statement of the problem: Currently, space-time resolution (STR) in the range 10-21 to 10-22 ms is available exclusively at free electron laser facilities, or by a few laser microscopes based on hig ...

    SBIR Phase I 2015 Department of Energy
  3. Single Crystal Diamond Compound Refractive Lenses

    Amount: $149,939.00

    Statement of the problem: Next generation light sources, diffraction-limited storage rings, and high repetition rate free electron lasers will significantly increase the average brightness of the gene ...

    SBIR Phase I 2015 Department of Energy
  4. Staging for Wakefield Acceleration Experiment Hardware Development: Fast Kicker and High Power RF Delay Section

    Amount: $999,758.00

    Linear colliders based on two-beam wakefield acceleration have an intrinsically modular design. A fundamental requirement of two-beam wakefield acceleration that has yet to be demonstrated is the stag ...

    SBIR Phase II 2015 Department of Energy
  5. Staging for Wakefield Acceleration Experiment Hardware Development: Fast Kicker and High Power RF Delay Section

    Amount: $149,742.00

    Linear colliders based on two-beam wakefield acceleration have a modular design. A fundamental requirement of two beam wakefield acceleration that has yet to be demonstrated is the staging of sequent ...

    SBIR Phase I 2014 Department of Energy
  6. Power Tunable High and Narrowband THz source for THz Pump X-Ray Probe Experiments

    Amount: $999,456.00

    Most time resolved studies of processes in materials to date have made use of readily available visible and near-visible pump sources to trigger the events and, thus were able to study only a small su ...

    SBIR Phase II 2014 Department of Energy
  7. Power Tunable High and Narrowband THz source for THz Pump X-ray Probe Experiments

    Amount: $149,900.00

    Most time resolved studies to date have made use of readily available visible and near-visible pump sources to trigger the events and, thus were able to study only a small subset of phe ...

    SBIR Phase I 2013 Department of Energy
  8. Metal Plasmonic Nanostructures Functionalized by Atomic Layer Deposition of 2A Metal-Oxides for Robust High-Quantum-Efficiency Ultrafast Photocathodes

    Amount: $149,982.00

    High quantum efficiency (QE) photocathodes are central for efficient photoinjectors and ultra-fast electron microscopes. Current high QE photo cathode materials like GaAs, alkali-tellurides and alkali ...

    SBIR Phase I 2013 Department of Energy
  9. High Power High Frequency RF Generation

    Amount: $149,992.00

    The principal goal of this project is to develop two RF power extraction structures (an X-band and a W-band device) to demonstrate high power high frequency RF generation using high current relativist ...

    SBIR Phase I 2013 Department of Energy
  10. Improved Capillary Guided Laser Wakefield Accelerators based on Diamond Materials

    Amount: $999,950.00

    The laser plasma accelerator (LPA) is a very promising technology for generating gamma rays for the detection of contraband bulk nuclear materials, but is currently limited by the rate at which the ...

    STTR Phase II 2013 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government