Flam & Russell, Inc.

Basic Information

506 Prudential Road
Horsham, PA, 19044

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 55


  1. RADAR HIGH ANGLE RESOLUTION TECHNIQUES

    Amount: $566,092.00

    Existing radars are very powerful and perform many functions. However, they have difficulty resolving multiple targets in the same range cell with similar doppler shifts when the targets are close in ...

    SBIR Phase II 1995 Navy Department of Defense
  2. FOUR INPUT STACKED MICROWAVE ANTENNA

    Amount: $371,656.00

    A UNIQUE AND BENEFICIAL CONFIGURATION FOR A MULTIPLE INPUT OMNIDIRECTIONAL MICROWAVE ANTENNA IS DESCRIBED, IN WHICH A CIRCULAT PHASED ARRAY OF EIGHT ANTENNA ELEMENTS IS FED BY AN EIGHT INPUT BUTLER NE ...

    SBIR Phase II 1993 Army Department of Defense
  3. ELECTROMAGNETIC MILLIMETER WAVE NONDESTRUCTIVE EVALUATION OF RADOMES

    Amount: $49,748.00

    N/A

    SBIR Phase I 1993 Navy Department of Defense
  4. DEVELOPMENT OF MOBILE SURFACE CLUTTER MAPPER

    Amount: $499,890.00

    THE CHARACTERIZATION OF CLUTTER IS CRITICAL TO THE DESIGN, DEVELOPMENT, AND TEST OF MODERN MILITARY SEEKER AND RADAR SYSTEMS. THE NATURE OF CLUTTER IS SUCH THAT IT CAN BE CHARACTERIZED ANALYTICALLY ON ...

    SBIR Phase II 1992 Navy Department of Defense
  5. AN/FPQ RADAR AUTOMATED PHASE TRACKING RECEIVER UPGRADE

    Amount: $449,867.00

    MANY GOVERNMENT WEAPONS TESTING FACILITIES SUCH AS THE KWAJALEIN MISSILE RANGE DEPEND ON C BAND TRACKING RADARS SUCH AS THE AN/FPQ-19 TO PROVIDE ANGLE TRACKING AND RANGE DATA DURING MISSILE TESTS. THE ...

    SBIR Phase II 1992 Army Department of Defense
  6. MULTIPATH SUPPRESSION TECHNIQUES

    Amount: $48,940.00

    Millimeter waveradars are small and have narrow antenna beams. They are potentially well-suited for close-range fire control and target tracking. In particular, the Army is interested in a groung-base ...

    SBIR Phase I 1992 Army Department of Defense
  7. ESTABLISHING SOFTWARE DEVELOPMENT PROCESS CONTROL THROUGH PROCESS QUALITY INDICATORS

    Amount: $49,965.00

    1To produce and maintain product quality we contend that one must control the development and maintenance processess through the collection, examination and analysis of both process and product indica ...

    SBIR Phase I 1992 Navy Department of Defense
  8. Optimized Antennas for Multispectrum Guidance

    Amount: $49,923.00

    Modern seeker systems that employ multispectrum technology to optimize missile guidance performance are limited by the available volume. Specifically, placement of an IR seeker in the nose of an RF se ...

    SBIR Phase I 1992 Navy Department of Defense
  9. RADAR HIGH ANGLE RESOLUTION TECHNIQUES

    Amount: $49,965.00

    N/A

    SBIR Phase I 1992 Navy Department of Defense
  10. WIDEBAND ELECTRIC MAGNETIC FIELD SENSORS

    Amount: $49,989.00

    THE ABILITY TO MEASURE THE STRENGTH OF ELECTROMAGNETIC FIELDS IS OF EXTREME IMPORTANCE IN MANY AREAS. TODAY'S FREQUENCY SPECTRUM IS CROWDED. ELECTROMAGNETIC FIELDS ARE EVERYWHERE AND AT ALL FREQUENCIE ...

    SBIR Phase I 1991 Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government