Fluid Physics Ind.

Basic Information

4265 Manchester Ave.
Encinitas, CA, 92024

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 2


  1. "Electrothermal Gun Interior Ballistics Model Assessment"

    Amount: $57,527.00

    THE ELECTRO-THERMAL-COMBUSTION (ETC) GUN CONCEPT WAS DEVELOPED AS AN ADVANCED TECHNIQUE FOR HYPERVELOCITY GUN SYSTEMS WHICH AUGMENTS THE ELECTRICAL ENERGY INPUT OF THE ORIGINAL ET GUN BY USING A REACT ...

    SBIR Phase I 1993 Defense Threat Reduction AgencyDepartment of DefenseDepartment of Defense
  2. HYPERSONIC RAREFIED FLOW SIMULATOR

    Amount: $57,388.00

    THE ABILITY TO ACCURATELY PREDICT HEAT AND AERODYNAMIC FORCE LOADING ON HYPERSONIC REENTRY VEHICLES IN NON-CONTINUUM RAREFIED FLOW REGIMES REQUIRES SIMULATION OF THE MOLECULAR NATURE OF THE FLOW ENVIR ...

    SBIR Phase I 1989 Air ForceDepartment of DefenseDepartment of Defense
  3. "SEVERE ACCIDENT PHENOMENA: NATURAL CIRCULATION IN REACTOR COOLANT SYSTEM"

    Amount: $50,000.00

    A RESEARCH PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A VALIDATED METHODOLOGY FOR PREDICTING THE EX-VESSEL BUOYANCY-DRIVEN FLOWS IN THE HOT LEG AND STEAM GENERATOR OF A WESTINGHOUSE PLANT, AND IN THE ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. DUSTY FLOW PRESSURE GAUGE DESIGN ANALYSIS

    Amount: $68,976.00

    THE PROBLEM OF GAS DYNAMIC FLOW PROPERTY MEASUREMENT IN PARTICLE LADEN FLOWS IS ADDRESSED VIA AN ADVANCED NUMERICAL MODEL SIMULATION STUDY OF PRESSURE GAUGE RESPONSE. THE APPROACH UTILIZES A HIGH-ORDE ...

    SBIR Phase II 1987 Defense Threat Reduction AgencyDepartment of DefenseDepartment of Defense
  5. STOCHASTIC PARTICLE TURBULENT TWOPHASE FLOW ANALYSIS OF AERODYNAMIC SCOURING

    Amount: $53,620.00

    THE PROBLEM OF AERODYNAMIC ENTRAINMENT OF PARTICULATE FROM FRANGIBLE MATERIALS HAS CONSIDERABLE GEOPHYSICAL, TECHNOLOGICAL, AND MILITARY SIGNIFICANCE. PROBLEMS SUCH AS SOIL EROSION, TERRESTRIAL AND PL ...

    SBIR Phase I 1987 Defense Threat Reduction AgencyDepartment of DefenseDepartment of Defense
  6. DUSTY FLOW PRESSURE GAUGE DESIGN ANALYSIS

    Amount: $52,510.00

    N/A

    SBIR Phase I 1986 Defense Threat Reduction AgencyDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government