Fluidyne Corp

Basic Information

28 37th Street Ne
Auburn, WA, 98002

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. CONTAINMENT OF TOXIC WASTE BY IN SITU CONSTRUCTION OF BARRIER WALL

    Amount: $50,000.00

    THE CONTAINMENT OF TOXIC MATERIALS ALREADY BURIED IN THE GROUND AND THE CONSTRUCTION OF NEW DISPOSAL SITES ARE DIFFI-CULT TASKS. IN BOTH CASES THERE IS A NEED FOR VERTICAL AND HORIZONTAL BARRIER WALLS ...

    SBIR Phase I 1988 Environmental Protection Agency
  2. RESEARCH TO INVESTIGATE THE POTENTIALS OF ABRASION JET IN TRANSPORT SYSTEMS CONSTRUCTION

    Amount: $287,100.00

    HIGH-PRESSURE WATERJET IS ONE OF SEVERAL NEW METHODS FOR CUTTING MATERIALS DEVELOPED DURING THE LAST DECADE. CURRENTLY IT IS USED, AT STATIC WATER PRESSURE UP TO 60,000 PSI, TO CUT A WIDE VARIETY OF S ...

    SBIR Phase II 1985 Department of Transportation
  3. RESEARCH TO INVESTIGATE THE POTENTIALS OF ABRASION JET IN TRANSPORT SYSTEMS CONSTRUCTION

    Amount: $50,000.00

    N/A

    SBIR Phase I 1984 Department of Transportation

Agency Micro-sites

US Flag An Official Website of the United States Government