TETHERS UNLIMITED, INC.

Basic Information

11711 N CREEK PKWY S STE D113
BOTHELL, WA, 98011-8804

http://www.tethers.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 877425330
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 32


  1. CRISSP- Customizable Recyclable International Space Station Packaging

    Amount: $749,872.00

    The CRISSP Phase II effort will mature to TRL-6 recyclable launch packaging materials to enable sustainable in-space manufacturing on the ISS and future manned deep space missions. Our Phase I effort ...

    SBIR Phase II 2016 National Aeronautics and Space Administration
  2. Multi-sensor ASW Pod System (MAPS)

    Amount: $79,947.00

    The Multi-sensor ASW Pod System (MAPS) effort will develop an integrated system for vertical takeoff unmanned aerial vehicle anti-submarine warfare operations. MAPS will be composed of a podded system ...

    SBIR Phase I 2015 Department of Defense Navy
  3. Positrusion Filament Recycling System for ISS

    Amount: $749,978.00

    The Positrusion ISS Recycler enables recycling of scrap and waste plastics into high-quality filament for 3D printers to enable sustainable in-situ manufacturing on the ISS and future deep-space manne ...

    SBIR Phase II 2015 National Aeronautics and Space Administration
  4. CRISSP- Customizable Recyclable International Space Station Packaging

    Amount: $124,976.00

    While additive manufacturing is a game changing technology for in-space repairs and part formation, it still requires a plastic feedstock material to fabricate the printed parts. For longer duration ...

    SBIR Phase I 2015 National Aeronautics and Space Administration
  5. ARACMO: Advanced Regolith Anchoring for Cable-assisted Mobility

    Amount: $124,900.00

    To enable future robotic exploration systems to have greater mobility capabilities on difficult terrain such as craters, cliffs, gullies, and skylights, Tethers Unlimited proposes to develop the "Adva ...

    SBIR Phase I 2015 National Aeronautics and Space Administration
  6. VORTEX Gimbal

    Amount: $124,947.00

    To overcome the communication gap to Venus, TUI proposes to develop the Venus or Titan Exploratory (VORTEX) Gimbal to point a meter scale diameter, high gain antenna. The VORTEX Gimbal is a highly adv ...

    SBIR Phase I 2015 National Aeronautics and Space Administration
  7. Nanosatellite to Standard Army Handheld Radio Communications System

    Amount: $562,414.00

    TUI proposes to complete the development of two novel technologies that will enable pico-satellites in LEO to efficiently close the link with standard issue handheld radios on the ground. The first te ...

    SBIR Phase II 2014 Army Department of Defense
  8. Micro-MAD Tow System

    Amount: $79,998.00

    Tethers Unlimited, Inc. (TUI) proposes to develop a system for towing micro Magnetic Anomaly Detection (MAD) sensors from unmanned and manned rotary-wing aerial vehicles such as the Fire Scout MQ-8C V ...

    SBIR Phase I 2014 Department of Defense Navy
  9. Remote Anchor Module (RAM) Launch-able Tagline and Remote Anchor System

    Amount: $494,405.00

    TUI proposes to develop the Remote Anchoring Module (RAM), a launch-able anchoring system that can quickly set an anchor and tagline at a remote location without the need for manual emplacement. The ...

    SBIR Phase II 2014 Department of Defense Army
  10. TRUSSELATOR- On-Orbit Fabrication of High Performance Support Structures for Solar Arrays

    Amount: $749,998.00

    The Trusselator technology will enable on-orbit fabrication of support structures for high-power solar arrays and large antennas, achieving order-of-magnitude improvements in packing efficiency and la ...

    SBIR Phase II 2014 National Aeronautics and Space Administration

Agency Micro-sites

US Flag An Official Website of the United States Government