ENHANCED EGRESS REQUIREMENTS NECESSITATES A RATE OF ADVANCE OF 80 FT/HR FOR BOTH A BORING MACHINE AND GROUND SUPPORT LINING SYSTEM.

Award Information
Agency:
Department of Defense
Branch
Air Force
Amount:
$68,905.00
Award Year:
1986
Program:
SBIR
Phase:
Phase I
Contract:
n/a
Agency Tracking Number:
3930
Solicitation Year:
n/a
Solicitation Topic Code:
n/a
Solicitation Number:
n/a
Small Business Information
Foster-miller Inc
350 Second Ave, Waltham, MA, 02254
Hubzone Owned:
N
Socially and Economically Disadvantaged:
N
Woman Owned:
N
Duns:
n/a
Principal Investigator:
ROBERT N TORBIN
(617) 890-3200
Business Contact:
Research Institution:
n/a
Abstract
ENHANCED EGRESS REQUIREMENTS NECESSITATES A RATE OF ADVANCE OF 80 FT/HR FOR BOTH A BORING MACHINE AND GROUND SUPPORT LINING SYSTEM. THIS ADVANCE RATE IS BEYOND THE CURRENT TECHNICAL FEASIBILITY OF ALL STATE-OF-THE-ART LINING SYSTEMS. AN INNOVATIVE PRESSURIZED LINING SYSTEM USING A POLYMERIC MATERIAL IS PRESENTED WHICH WILL MEET BOTH THE STRUCTURAL, AS WELL AS, OPERATIONAL REQUIREMENTS OF THE EGRESS OPERATION. THE RAPID LINING SYSTEM POSSESSES A MECHANICAL SIMPLICITY AND OPERATIONAL PROCESS WHICH ALLOWS FOR CONTINUOUS, REMOTE CONTROL OF THE HARDWARE. THE LINING SYSTEM, AS CONCEIVED, WILL BE ADAPTABLE TO ANY EGRESS BORING MACHINE AND WOULD NOT INTERFER WITH ANY MUCK HANDLING SCHEME. PHASE I WILL EXAMINE KEY TECHNICAL ISSUES INCLUDING LINING MATERIAL EVALUATION, DISTRIBUTION UNDER PRESSURE, DEVELOPMENT OF A CONCEPTUAL DESIGN AND EVALUATION OF MAJOR HARDWARE SYSTEMS.