Frost Engineering Development

Address

Po Box 1294 - 3900 S Kalamath
Englewood, CO, 80150

Information

DUNS:
# of Employees: 14

Ownership Information

Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N

Award Charts




Award Listing

  1. AN IMPROVED UPPER TORSO HAULBACK AND INERTIA REEL SYSTEM FOR EJECTION SEATS

    Amount: $553,057.00

    UPPER TORSO HAULBACK MUST BE COMPLETED RAPIDLY TO ASSURE TIMELY EJECTION UNDER ADVERSE CONDITIONS YET THE HAULBACK MOTION SHOULD NOT INJURE THE PILOT. DESIGN OF A HAULBACK SYSTEM SHOULD INCLUDE CONSID ...

    SBIRPhase II1991Air Force Department of Defense
  2. PARACHUTE OPENING SHOCK LOAD LIMITING SYSTEM

    Amount: $68,664.00

    THERE IS A NEED TO SHAPE THE OPENING SHOCK FORCE-TIME PULSE OF A PERSONNEL PARACHUTE IN ORDER TO OBTAIN MAXIMUM DECELERATION WITH A MINIMUM PROBABILITY OF INJURY TO AN EJECTEE. ANALYSIS OF THE BIODYNA ...

    SBIRPhase I1990Navy Department of Defense
  3. AN IMPROVED UPPER TORSO HAULBACK AND INERTIA REEL SYSTEM FOR EJECTION SEATS

    Amount: $49,816.00

    N/A

    SBIRPhase I1989Air Force Department of Defense
  4. FORCE AND PRESSURE/CONTACT INSTRUMENTATION FOR PARACHUTE HARNESSES

    Amount: $49,016.00

    PARACHUTE AND HARNESS DESIGNS NEED TO BE IMPROVED IN ORDER TO PERMIT PARATROOPER DROPS AT HIGHER SPEEDS AND LOW ALTITUDES. LITTLE IS KNOWN ABOUT HOW OPENING SHOCK FORCES ARE TRANSMITTED TO THE PARACHU ...

    SBIRPhase I1988Army Department of Defense
  5. HIGH SPEED PERSONNEL PARACHUTE ENERGY ABSORBER

    Amount: $49,075.00

    A SHORT-STROKE ENERGY ABSORBER CAN BE USED TO REDUCE PARACHUTE SNATCH FORCE AND THE ONSET RATE OF THE OPENING SHOCK. SUCH A DEVICE MUST OPERATE WITH THE DESIRED OPENING SHOCK FORCES AND BE NONELASTIC, ...

    SBIRPhase I1987Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government