Global Assoc., Ltd.

Basic Information

7600 Leesburg Pike
Falls Church, VA, 22043

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 16


  1. Passive Acoustic Transient Detection and Analysis of Mine Operations

    Amount: $69,956.00

    This proposal investigates spectral decomposition methods for identifying and classifying mine-related acoustic events. Minelaying operations produce a set of acoustic signature events ranging from ...

    SBIR Phase I 1997 Navy Department of Defense
  2. Architecture and Tools for Processing Pre-Award Systems Acquisition Documents

    Amount: $79,998.00

    Implementation of Federal Acquisition Streamlining Act of 1994 set into motion a series of changes requiring Government use of Electronic Data Interchange (EDI). Small businesses can use EDI to acqui ...

    SBIR Phase I 1996 Air Force Department of Defense
  3. A Polar Nephelometer Beta-C Meter to support underwater optical

    Amount: $544,862.00

    IN TODAY'S LITTORAL WARFARE ENVIRONMENT, SUBMARINES WILL BE CALLED UPON TO OPERATE IN MANY DIVERSE, CHALLENGING AND COMPLEX THREAT ENVIRONMENTS, WITH MANY BACKGROUND TARGETS, EACH EMITTING ENERGY IN S ...

    SBIR Phase II 1995 Navy Department of Defense
  4. FUZZY LOGIC ALGORITHM GROUPING (FLAG) DATA FUSION

    Amount: $66,933.00

    The purpose of the FLAG (Fuzzy Logic Algorithm Grouping) Data Fusion SBIR is to provide an enhancement to the Navy's warfare capabilities in C4I (Command, Control, Computer, Communications and Intelli ...

    SBIR Phase I 1994 Navy Department of Defense
  5. A Polar Nephelometer Beta-C Meter to support underwater optical

    Amount: $99,409.00

    N/A

    SBIR Phase I 1994 Navy Department of Defense
  6. GENERALIZED, DATA ADAPTIVE, TIME-FREQUENCY REPRESENTATIONS FOR IUSS CLASSIFICATION

    Amount: $49,557.00

    N/A

    SBIR Phase I 1993 Navy Department of Defense
  7. FIBER OPTIC TELEMETRY SYSTEMS

    Amount: $552,500.00

    LARGE AREA ARRAYS WILL EMPLOY A VAST NUMBER OF ELEMENTS AND THIS REQUIRES THAT TELEMETRY SYSTEMS BE UPGRADED TO HANDLE THE INCREASE IN DATA TRANSMISSION AND PROCESSING REQUIREMENTS. THE NUMBER OF HULL ...

    SBIR Phase II 1990 Navy Department of Defense
  8. NON-ACOUSTIC SENSOR AND GUIDANCE FOR UNDERWATER VEHICLES

    Amount: $49,989.00

    THE WORK PROPOSED IN THIS PHASE I EFFORT WILL DETERMINE THE PERFORMANCE ENVELOPE OF TWO NON-ACOUSTIC SYSTEMS EMPLOYED FOR DIFFERENT APPLICATIONS: 1) A LASER RADAR SYSTEM USED FOR UNDERWATER TARGET TRA ...

    SBIR Phase I 1989 Navy Department of Defense
  9. FIBER OPTIC TELEMETRY SYSTEMS

    Amount: $49,990.00

    N/A

    SBIR Phase I 1988 Navy Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government