Global Strategic Solutions LLC

Basic Information

22375 Broderick Drive
Suite 140
Sterling, VA, 20166-9345

http://www.gssllc.net

Company Profile

n/a

Additional Details

Field Value
DUNS: 608472374
Hubzone Owned: N
Socially and Economically Disadvantaged: Y
Woman Owned: N
Number of Employees: 12


  1. Improved Electronics Maintenance through Tester Prognostics

    Amount: $652,379.00

    Prognostics and health management (PHM) technology is critical for monitoring, detecting, and managing impending faults and enabling proactive maintenance of electronic systems before actual failures ...

    SBIR Phase II 2015 Department of Defense Navy
  2. Improved Electronics Maintenance through Tester Prognostics

    Amount: $79,582.00

    Prognostics and health management (PHM) technology is critical for monitoring, detecting, and managing impending faults and enabling proactive maintenance of electronic systems before actual failures ...

    SBIR Phase I 2014 Navy Department of Defense
  3. Dynamic Physical/Data-Driven Models for System-Level Prognostics and Health Management

    Amount: $69,457.00

    Prognostics and health management (PHM) systems are critical for detecting impending faults and enabling a proactive decision process for maintenance or replacement of avionics systems before actual f ...

    STTR Phase I 2010 Navy Department of Defense
  4. Advanced Prognostic and Health Management (PHM) and Model Based Prognostic Useful Life Remaining Capabilities for Aircraft Tactical Information and Co

    Amount: $900,186.00

    Prognostics and health management technologies are critical for detecting impending equipment failures and enabling a proactive decision process for maintaining or replacing components before actual f ...

    SBIR Phase II 2008 Navy Department of Defense
  5. Aircraft Electrical Power System Diagnostics and Health Management

    Amount: $1,586,010.00

    Based on the research and analysis conducted during Phase I, it was determined that it is feasible to detect, diagnose, predict and manage impending failures in a rotating electrical machine (e.g., ai ...

    STTR Phase II 2008 Navy Department of Defense
  6. Advanced Prognostic and Health Management (PHM) and Model Based Prognostic Useful Life Remaining Capabilities for Aircraft Tactical Information and Co

    Amount: $149,767.00

    Prognostics and health management technologies are critical for detecting impending equipment failures and enabling a proactive decision process for maintaining or replacing components before actual f ...

    SBIR Phase I 2007 Navy Department of Defense
  7. Aircraft Electrical Power System Diagnostics and Health Management

    Amount: $99,737.00

    Prognostics and health management is a critical technology for accurately predicting impending failures and providing a decision process for replacing components before actual failures occur. This is ...

    STTR Phase I 2006 Navy Department of Defense
  8. Eliminating Legacy Performance Barriers Imposed on New Systems

    Amount: $97,977.00

    Cost savings and significant gains in system performance, system utilization, and throughput could be realized, when upgrading, modernizing or replacing subsystems, if the integration of new technolog ...

    SBIR Phase I 2006 Air Force Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government