Gms Engineering Corp.

Basic Information

8940-d Route 108
Columbia, MD, 21045

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 12


  1. DEVELOPMENT OF A PORTABLE G-HARDENED ELECTRO-PHYSIOLOGICAL DATA AND STORAGE DEVICE

    Amount: $483,563.00

    IN THIS PROPOSE PHASE I SBIR DESIGN EFFORT, WE WILL DESIGN A PORTABLE, MULTICHANNEL, BATTERY-OPERATED DEVICE THAT WILL DIGITIZE, PROCESS, AND STORE PHYSIOLOGICAL DATA. IT WILL OPERATE IN FLIGHT UNDER ...

    SBIR Phase II 1989 Air Force Department of Defense
  2. NON-INVASIVE DETERMINATION OF CORE TEMPERATURE

    Amount: $50,791.00

    IN THIS PROPOSED PHASE I SBIR RESEARCH EFFORT, WE WILL DEVELOP A TECHNIQUE FOR RAPID, NON-INVASIVE DETERMINATION OF CORE TEMPERATURE FROM MEASURED PARAMETERS OF RESPIRED AIR (TEMPERATURE, HUMIDITY, AN ...

    SBIR Phase I 1988 Army Department of Defense
  3. DEVELOPMENT OF A PORTABLE G-HARDENED ELECTRO-PHYSIOLOGICAL DATA AND STORAGE DEVICE

    Amount: $47,121.00

    N/A

    SBIR Phase I 1988 Air Force Department of Defense
  4. THE LONG-TERM OBJECTIVE OF THIS PROPOSAL IS TO DEVELOP TECHNOLOGY FOR REMOVING ARTIFACTS FROM BRAIN ACTIVITY (EEG) MEASUREMENTS IN ORDER TO ALLOW AUTOMATED EEG ANALYSIS.

    Amount: $50,000.00

    THE LONG-TERM OBJECTIVE OF THIS PROPOSAL IS TO DEVELOP TECHNOLOGY FOR REMOVING ARTIFACTS FROM BRAIN ACTIVITY (EEG) MEASUREMENTS IN ORDER TO ALLOW AUTOMATED EEG ANALYSIS. THISCAPABILITY WILL BE IMPORTA ...

    SBIR Phase I 1986 Department of Health and Human Services
  5. PARTITION ING CONCEPTUAL DESIGN

    Amount: $52,215.00

    PROPOSED IS THE CONCEPTUAL DESIGN OF A SYSTEM FOR ACQUIRING AND ANALYZING PHYSIOLOGICAL AND OVERT BEHAVIORAL DATA FROM OPERATORS (OF COMPLEX MAN MACHINE SYSTEMS) SO AS TO IDENTIFY OPERATOR FUNCTIONAL ...

    SBIR Phase I 1985 Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government