You are here

Gms Engineering Corp.

Company Information
Address
8940-d Route 108
Columbia, MD 21045
United States



Information

UEI: N/A

# of Employees: 12


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. DEVELOPMENT OF A PORTABLE G-HARDENED ELECTRO-PHYSIOLOGICAL DATA AND STORAGE DEVICE

    Amount: $483,563.00

    IN THIS PROPOSE PHASE I SBIR DESIGN EFFORT, WE WILL DESIGN A PORTABLE, MULTICHANNEL, BATTERY-OPERATED DEVICE THAT WILL DIGITIZE, PROCESS, AND STORE PHYSIOLOGICAL DATA. IT WILL OPERATE IN FLIGHT UNDER ...

    SBIRPhase II1989Department of Defense Air Force
  2. NON-INVASIVE DETERMINATION OF CORE TEMPERATURE

    Amount: $50,791.00

    IN THIS PROPOSED PHASE I SBIR RESEARCH EFFORT, WE WILL DEVELOP A TECHNIQUE FOR RAPID, NON-INVASIVE DETERMINATION OF CORE TEMPERATURE FROM MEASURED PARAMETERS OF RESPIRED AIR (TEMPERATURE, HUMIDITY, AN ...

    SBIRPhase I1988Department of Defense Army
  3. DEVELOPMENT OF A PORTABLE G-HARDENED ELECTRO-PHYSIOLOGICAL DATA AND STORAGE DEVICE

    Amount: $47,121.00

    N/A

    SBIRPhase I1988Department of Defense Air Force
  4. THE LONG-TERM OBJECTIVE OF THIS PROPOSAL IS TO DEVELOP TECHNOLOGY FOR REMOVING ARTIFACTS FROM BRAIN ACTIVITY (EEG) MEASUREMENTS IN ORDER TO ALLOW AUTOMATED EEG ANALYSIS.

    Amount: $50,000.00

    THE LONG-TERM OBJECTIVE OF THIS PROPOSAL IS TO DEVELOP TECHNOLOGY FOR REMOVING ARTIFACTS FROM BRAIN ACTIVITY (EEG) MEASUREMENTS IN ORDER TO ALLOW AUTOMATED EEG ANALYSIS. THISCAPABILITY WILL BE IMPORTA ...

    SBIRPhase I1986Department of Health and Human Services
  5. PARTITION ING CONCEPTUAL DESIGN

    Amount: $52,215.00

    PROPOSED IS THE CONCEPTUAL DESIGN OF A SYSTEM FOR ACQUIRING AND ANALYZING PHYSIOLOGICAL AND OVERT BEHAVIORAL DATA FROM OPERATORS (OF COMPLEX MAN MACHINE SYSTEMS) SO AS TO IDENTIFY OPERATOR FUNCTIONAL ...

    SBIRPhase I1985Department of Defense Army
US Flag An Official Website of the United States Government