Green Mountain Radio Research Company

Company Information

Company Name
Green Mountain Radio Research Company
Address
77 Vermont Avenue
Colchester, VT, 05446-3121
Phone
1 802-655-9670
URL
n/a
DUNS
57688624
Number of Employees
3

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$2,047,656.00
24
SBIR Phase II
$5,741,201.00
9
Chart code to be here

Award List

  1. SIGNAL PROCESSING FOR THROUGH-THE-EARTH COMMUNICATIONS

    Amount: $460,000.00

    RELIABLE THROUGH-THE-EARTH COMMUNICATIONS (TEC) ARE NEEDED FOR COMMAND AND CONTROL OF DEEP-BASED ICBM SITES. THE REQUIRED DATA RATES CAN BE ACHIEVED BY USING BOTH SIGNAL CODING AND SIGNAL-TONOISE-RATI ...

    SBIR Phase II 1985 Air ForceDepartment of Defense
  2. POWER-AMPLIFIER SYSTEM FOR ADAPTIVE JAMMER

    Amount: $538,000.00

    THE PROPOSED PROGRAM IS A FEASIBILITY STUDY AND SYSTEM DESIGN FOR AN INNOVATIVE POWER-AMPLIFIER SYSTEM FOR THE ADAPTIVE-JAMMER APPLICATION. THIS SYSTEM OPERATES OVER THE ENTIRE HF AND VHF RANGE (3 - 3 ...

    SBIR Phase II 1988 ArmyDepartment of Defense
  3. ANTENNA SYSTEM FOR MOBILE MISSILE LAUNCHERS

    Amount: $58,291.00

    A VARIETY OF ADVANCED-BASING CONCEPTS ENHANCE SURVIVABILITY BY COMBINING MISSILE MOBILITY WITH FIXED PROTECTIVE STRUCTURES (TUNNELS, GARAGES, ETC.). PROVIDING COMMUNICATION CONNECTIVITY BY INSTALLING ...

    SBIR Phase I 1988 Air ForceDepartment of Defense
  4. FEASIBILITY STUDY OF COMMUNICATIONS THROUGH INTERVENING MEDIA

    Amount: $59,208.00

    A VARIETY OF ADVANCED-BASING CONCEPTS ENHANCE SURVIVABILITY BY COMBINING MISSILE MOBILITY WITH FIXED PROTECTIVE STRUCTURES (TUNNELS, GARAGES, ETC.). PROVIDING COMMUNICATION CONNECTIVITY BY INSTALLING ...

    SBIR Phase I 1988 Air ForceDepartment of Defense
  5. FEASIBILITY STUDY FOR INTEGRATED ANTENNA-AMPLIFIER NETWORK

    Amount: $525,000.00

    OPERATION OF A JAMMER TRANSMITTER FROM A SMALL PLATFORM (RPV OR JEEP) NECESSITATES THE USE OF ELECTRICALLY SHORT ANTENNAS SUCH AS SHORT WHIPS AND SMALL LOOPS. THE CONVENTIONAL APPROACH USES A POWER AM ...

    SBIR Phase II 1991 ArmyDepartment of Defense
  6. FEASIBILITY STUDY FOR HIGH-DATA-RATE NONDENIABLE COMMUNICATIONS

    Amount: $61,786.00

    MAINTAINING COMMAND-AND-CONTROL COMMUNICATIONS CONNECTIVITY CONTINUOUSLY THROUGH PRE-, TRANS-, AND POST-ATTACK PERIODS IS ESSENTIAL. COMMUNICATION LINKS FOR THIS APPLICATION SHOULD BE NONDENIABLE (BY ...

    SBIR Phase I 1990 Air ForceDepartment of Defense
  7. FEASIBILITY STUDY OF HIGH-EFFICIENCY RF-POWER COMBINERS

    Amount: $61,162.00

    MODERN HF/VHF JAMMERS EMPLOY POWER COMBINERS AND MULTIPLE POWER-AMPLIFIER (PA) MODULES TO ACHIEVE A HIGH POWER OUTPUT, CANCELLATION OF HARMONICS, AND GRADUAL DEGRADATION OF PERFORMANCE DUE TO MODULE F ...

    SBIR Phase I 1991 ArmyDepartment of Defense
  8. RF Transmitter/Locator

    Amount: $61,642.00

    The RF transmitter/locator (TL) concept presented in this proposal enables the location and recovery of a canister such as a nose cone, artillery shell, buoy, or instrument package. The system operate ...

    SBIR Phase I 1992 ArmyDepartment of Defense
  9. High-power Electronic Tuning

    Amount: $99,037.00

    Tunable HF/VHF filters capable of operating at high power levels are needed for preventing a jammer from interfering with nearby friendly communications, high-speed antenna tuners, and output filters ...

    SBIR Phase I 1997 ArmyDepartment of Defense
  10. N/A

    Amount: $748,996.00

    N/A

    SBIR Phase II 1999 ArmyDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government