Boulder Precision E-O

Basic Information

5733 central ave
Boulder, CO, -

Company Profile

n/a

Additional Details

Field Value
DUNS: 828719158
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 4


  1. Ultra?-stable, Portable Fabry?-Perot Cavities

    Amount: $749,118.00

    Frequency stabilized lasers are essential subsystems in many applications. Most importantly, they are used as flywheel oscillators in optical atomic clocks, as well as in many sensing and measurement ...

    STTR Phase II 2014 Department of DefenseDefense Advanced Research Projects AgencyDepartment of Defense
  2. Frequency Stabilized Laser for use in Microwave Generation

    Amount: $800,000.00

    This project aims to further develop the technology of frequency stabilized lasers for microwave generation, laser radar and other precision measurement applications. The goal is to decrease the nois ...

    SBIR Phase II 2013 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  3. Ultra-stable, Portable Fabry-Perot Cavities

    Amount: $99,989.00

    Frequency stabilized lasers are essential subsystems; as flywheel oscillators in optical atomic clocks, as well as in many sensing and measurement systems. In optical atomic clocks, Allan Deviations& ...

    STTR Phase I 2012 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  4. Frequency Stabilized Laser for use in Microwave Generation

    Amount: $149,447.00

    We construct a frequency stabilized laser which will generate 10 GHz microwaves with Phase noise -100 dBC/Hz at 1 Hz, or equivalently, an optical frequency with an Allan Deviation of 8e-16 and a drift ...

    SBIR Phase I 2012 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  5. A Laser Power-Build-Up System for H Atom Ionization

    Amount: $756,850.00

    Prior to injection into a proton accelerator, GeV energy Hydrogen negative ions must be ionized with good efficiency. Presently used carbon foil strippers become radioactive and produce uncontrolled ...

    SBIR Phase II 2010 Department of Energy
  6. A Laser Power-Build-Up System for H Atom Ionization

    Amount: $99,800.00

    Hydrogen negative ions must be ionized with high efficiency for injection into proton accelerators, such as those used at DOE facilities. To achieve this ionization, neutral atoms are first prepared ...

    SBIR Phase I 2009 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government