Hy-Tek Manufacturing Co. Inc.

Basic Information

1998 Bucktail Lane
Sugar Grove, IL, -

http://www.hytekmfg.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 106924822
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 38


  1. Water Vapor Extraction System (WaVES)

    Amount: $999,469.00

    During its Phase I SBIR research and development efforts Hy-Tek Mfg. Co. Inc. (HMC) designed, fabricated and demonstrated an innovative technology devised specifically to achieve the U.S. Army's CSS w ...

    SBIR Phase II 2015 Department of DefenseArmyDepartment of Defense
  2. Vectored Force Suspension Helmet Liner (VFSHEL)

    Amount: $149,774.00

    To overcome the capability gaps of current ECH suspension and retention liners, Hy-Tek Manufacturing Co. Inc. (HMC) will rely on a novel approach that significantly attenuates the transfer of low and ...

    SBIR Phase I 2014 Department of DefenseNavyDepartment of Defense
  3. Vectored Force Suspension Helmet Liner (VFSHEL)

    Amount: $149,774.00

    To overcome the capability gaps of current ECH suspension and retention liners, Hy-Tek Manufacturing Co. Inc. (HMC) will rely on a novel approach that significantly attenuates the transfer of low and ...

    SBIR Phase I 2014 Department of DefenseNavyDepartment of Defense
  4. Improved Retractable Mooring Fixture (IRMF)

    Amount: $79,528.00

    Hy-Tek Manufacturing Co. Inc. (HMC) proposes a superior renovation solution for the DDG-51 class ships retractable mooring fixtures; namely bitt and chock assemblies. There are two major areas where t ...

    SBIR Phase I 2013 Department of DefenseNavyDepartment of Defense
  5. High Load Roller Bearing (HLRB)

    Amount: $289,800.00

    HMC"s approach to Phase I HLRB roller bearing design was to achieve separation of the radial and axial functions of the bearing so as to enable axial bearing movement independent of bearing rotat ...

    SBIR Phase II 2013 Department of DefenseNavyDepartment of Defense
  6. Powder Fluidization Grenade (PFG) for Particulate Obscurant Dissemination

    Amount: $1,048,908.00

    The use of high explosive powder obscurant (PO) grenades can cause serious injury and death as well as unwanted collateral damage in the form of incendiary destruction. U.S Army's objective is to ...

    SBIR Phase II 2013 ArmyDepartment of DefenseDepartment of Defense
  7. Joint Sealant for High Operating Temperatures (JSHOT)

    Amount: $99,886.00

    To overcome the capability gaps of current joint sealants, HMC will rely in part on our previous internal engineering analysis and experience to explore commercially available sealants that incorporat ...

    SBIR Phase I 2011 Department of DefenseAir ForceDepartment of Defense
  8. Automatic Load Balancing Device (ALBD) for Energy Efficient Tactical Shelters

    Amount: $99,954.00

    ABSTRACT: The purpose of this proposal is to demonstrate the feasibility of reducing fuel consumption by efficiently providing single phase 120VAC power distribution that is automatically load balanc ...

    SBIR Phase I 2011 Department of DefenseAir ForceDepartment of Defense
  9. Remote Environmental Control Unit (RECU) For Fuel Efficient FOBs

    Amount: $69,932.00

    The objective of this proposal is to demonstrate the feasibility of an energy efficient Environmental Control Unit (ECU) that significantly reduces generator fuel consumption at military forward opera ...

    SBIR Phase I 2011 Department of DefenseNavyDepartment of Defense
  10. High Load Roller Bearing (HLRB)

    Amount: $79,576.00

    The High Load Roller Bearing (HLRB) roller for severe service offers a zero-maintenance reliable replacement for bearing sets currently utilized on DDG-51 helicopter bay hanger doors. Enhanced seal de ...

    SBIR Phase I 2011 Department of DefenseNavyDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government