Hy-Tek Manufacturing Co. Inc.

Company Information

Company Name
Hy-Tek Manufacturing Co. Inc.
Address
1998 Bucktail Lane
Sugar Grove, IL, -
Phone
1 630-466-7664
URL
http://www.hytekmfg.com
DUNS
106924822
Number of Employees
38
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$627,374.00
7
SBIR Phase II
$1,338,708.00
2
Chart code to be here

Award List

  1. Electro-Magnetic Disruption of the RPG Shaped Charge Jet

    Amount: $99,728.00

    HMC's objective is to conduct an accelerated 3 month research and development effort to investigate the feasibility of applying the Lorentz Force to the creation of an electromagnetic armor system tha ...

    SBIR Phase I 2004 NavyDepartment of Defense
  2. Joint Sealant for High Operating Temperatures (JSHOT)

    Amount: $99,886.00

    To overcome the capability gaps of current joint sealants, HMC will rely in part on our previous internal engineering analysis and experience to explore commercially available sealants that incorporat ...

    SBIR Phase I 2011 Department of Defense
  3. Automatic Load Balancing Device (ALBD) for Energy Efficient Tactical Shelters

    Amount: $99,954.00

    ABSTRACT: The purpose of this proposal is to demonstrate the feasibility of reducing fuel consumption by efficiently providing single phase 120VAC power distribution that is automatically load balanc ...

    SBIR Phase I 2011 Department of Defense
  4. Remote Environmental Control Unit (RECU) For Fuel Efficient FOBs

    Amount: $69,932.00

    The objective of this proposal is to demonstrate the feasibility of an energy efficient Environmental Control Unit (ECU) that significantly reduces generator fuel consumption at military forward opera ...

    SBIR Phase I 2011 Department of Defense
  5. High Load Roller Bearing (HLRB)

    Amount: $79,576.00

    The High Load Roller Bearing (HLRB) roller for severe service offers a zero-maintenance reliable replacement for bearing sets currently utilized on DDG-51 helicopter bay hanger doors. Enhanced seal de ...

    SBIR Phase I 2011 Department of Defense
  6. Powder Fluidization Grenade (PFG) for Particulate Obscurant Dissemination

    Amount: $98,770.00

    The thrust of Hy-Tek Mfg. Co. Inc.'s PFG concept involves in-canister fluidization of dry PO powder using compressed gas possibly enhanced by mechanical vibration followed by dissemination of the ...

    SBIR Phase I 2011 Department of Defense
  7. Improved Retractable Mooring Fixture (IRMF)

    Amount: $79,528.00

    Hy-Tek Manufacturing Co. Inc. (HMC) proposes a superior renovation solution for the DDG-51 class ships retractable mooring fixtures; namely bitt and chock assemblies. There are two major areas where t ...

    SBIR Phase I 2013 Department of Defense
  8. High Load Roller Bearing (HLRB)

    Amount: $289,800.00

    HMC"s approach to Phase I HLRB roller bearing design was to achieve separation of the radial and axial functions of the bearing so as to enable axial bearing movement independent of bearing rotat ...

    SBIR Phase II 2013 Department of Defense
  9. Powder Fluidization Grenade (PFG) for Particulate Obscurant Dissemination

    Amount: $1,048,908.00

    The use of high explosive powder obscurant (PO) grenades can cause serious injury and death as well as unwanted collateral damage in the form of incendiary destruction. U.S Army's objective is to ...

    SBIR Phase II 2013 ArmyDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government