Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

Award Information
Agency: Department of Defense
Branch: Special Operations Command
Contract: USZA22-03-C-0028
Agency Tracking Number: 01SOC-046
Amount: $749,950.00
Phase: Phase II
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 2003
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
28 W 715 Mount Street Bld 2, Warrenville, IL, 60555
DUNS: 119460900
HUBZone Owned: N
Woman Owned: N
Socially and Economically Disadvantaged: N
Principal Investigator
 Jiten Shah
 Vice President of Technol
 (630) 225-3975
 jvs@packertech.com
Business Contact
 Charlotte Sartain
Title: Vice President Finance
Phone: (630) 577-1973
Email: cas@packereng.com
Research Institution
N/A
Abstract
The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fabricated and mechanically tested in PTI's labs, which are capable of testing a structure of this size, tovalidate the FEA models, the design, the fabrication process, and connectors. The structure will then be installed on a Mark V SOC craft and strain gauges will monitor its performance during an extensive period of use in normal operations. Another uniqueaspect of our proposal is the use of innovative software for the early identification of any changes in the performance of the structure. This patented software, SmartSignal, was developed at Argonne National Laboratory for monitoring nuclear reactors,and The Packer Group has been instrumental in its commercialization. This software is also being used to monitor the jet engines in Delta's fleet, power plants, and various industrial processes. PTI will also provide all of the support and documentationspecified in the Phase II requirements.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government