Kalsi Engineering, Inc.

Basic Information

745 Park Two Drive
Sugar Land, TX, 77478 0284

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: Y
Woman Owned: N
Number of Employees: n/a


  1. Advanced Sealed Bearing Assembly for Positive Displacement Motors used in Micro-borehole Drilling

    Amount: $750,000.00

    The DOE has identified a need for a sealed bearing assembly (SBA) so that positive displacement motors (PDMs) for microhole oil drilling can be used at high differential pressures. Current off-the-sh ...

    SBIR Phase II 2006 Department of Energy
  2. Advanced Sealed Bearing Asembly for Positive Discplacment Motors used in Micro-borehole Driling

    Amount: $100,000.00

    78930S Advances in "microhole" technologies, which use portable drilling rigs with a smaller footprint and lower environmental impact, are needed to benefit the small driller. This project will deve ...

    SBIR Phase I 2005 Department of Energy
  3. High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling

    Amount: $750,000.00

    40785 November 13, 1996 Kalsi Engineering, Inc. Reliable, long-life, high-speed bearings with high thrust are needed for roller cone bits used in hard rock d ...

    SBIR Phase II 1997 Department of Energy
  4. High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling

    Amount: $75,000.00

    N/A

    SBIR Phase I 1996 Department of Energy
  5. DEVELOPMENT OF A HIGHER PRESSURE ROTARY BLOWOUT PREVENTER FOR SAFE DIRECTIONAL DRILLING IN UNDERBALANCED APPLICATIONS

    Amount: $75,000.00

    THIS PROJECT IS AIMED AT THE DEVELOPMENT OF A NEW GENERATION OF ROTARY BLOWOUT PREVENTERS CAPABLE OF SAFE, RELIABLE, AND COST EFFECTIVE HANDLING OF THE HIGH PRESSURES EXPECTED IN UNDERBALANCED HORIZON ...

    SBIR Phase I 1994 Department of Energy
  6. Pressure Relief Valve for Cryogenic Gases with Modulating Pressure Control

    Amount: $70,000.00

    This proposal is aimed at the development of a gas pressure relief valve with modulating pressure control that provides for low- or no-impact during venting of low temperature cryogens in the range of ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  7. DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS

    Amount: $498,138.00

    THIS PROJECT IS AIMED AT SIGNIFICANTLY IMPROVING THE PERFORMANCE AND LIFE OF THE DOWNHOLE MUD MOTORS BY THE DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY. THE GOAL OF IMPROVING LIFE OF MUD MOTORS HAS ...

    SBIR Phase II 1991 Department of Energy
  8. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    Amount: $50,000.00

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMP ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS

    Amount: $50,000.00

    N/A

    SBIR Phase I 1990 Department of Energy
  10. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    Amount: $50,000.00

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS O ...

    SBIR Phase II 1988 Nuclear Regulatory Commission

Agency Micro-sites

US Flag An Official Website of the United States Government