Kimball Physics Inc

Basic Information

Kimball Hill Rd
Wilton, NH, 03086

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 25


  1. A CATHODE WILL BE DEVELOPED WHICH MINIMIZES THE HEATING POWER REQUIRED PER AMPERE OF ELECTRON GUN BEAM CURRENT, IS OF STUDY CONSTRUCTION TO WITHSTAND ROCKET FLIGHT, DOES NOT DETERIORATE DURING EXPOSURE TO ATMOSPHERIC GASSES WHILE COLD AND PRODUCES AT

    Amount: $50,000.00

    A CATHODE WILL BE DEVELOPED WHICH MINIMIZES THE HEATING POWER REQUIRED PER AMPERE OF ELECTRON GUN BEAM CURRENT, IS OF STUDY CONSTRUCTION TO WITHSTAND ROCKET FLIGHT, DOES NOT DETERIORATE DURING EXPOSUR ...

    SBIR Phase I 1985 Air Force Department of Defense
  2. A FLIGHT MODULE WILL BE DESIGNED AND CONSTRUCTED THAT WILL LEAD TO THE CONSTUCTION OF AN ELECTRON GUN SUITABLE FOR ROCKET, SPACE SHUTTLE, AND SATELLITE FLIGHT.

    Amount: $50,000.00

    A FLIGHT MODULE WILL BE DESIGNED AND CONSTRUCTED THAT WILL LEAD TO THE CONSTUCTION OF AN ELECTRON GUN SUITABLE FOR ROCKET, SPACE SHUTTLE, AND SATELLITE FLIGHT. AN ELECTRON GUN MODULE WITH A WIDE DYNAM ...

    SBIR Phase I 1985 Air Force Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government