NEW VME-FASTBUS INTERFACING ALTERNATIVES

Award Information
Agency: Department of Energy
Branch: N/A
Contract: N/A
Agency Tracking Number: 7016
Amount: $49,993.00
Phase: Phase I
Program: SBIR
Awards Year: 1987
Solitcitation Year: N/A
Solitcitation Topic Code: N/A
Solitcitation Number: N/A
Small Business Information
Kineticsystems Corp
11 Maryknoll Dr, Lockport, IL, 60441
Duns: N/A
Hubzone Owned: N
Woman Owned: N
Socially and Economically Disadvantaged: N
Principal Investigator
 MR MICHAEL J SKUBIC
 (815) 838-0005
Business Contact
Phone: () -
Research Institution
N/A
Abstract
BECAUSE OF THE RAPIDLY INCREASING DEMANDS ON DATA ACQUISITION AND COMPUTER PROCESSING SYSTEMS IN MOST DOE-FUNDED RESEARCH TODAY, FASTBUS HAS BECOME A VITAL PRESENCE IN HIGH-ENERGY PHYSICS PROJECTS WORLDWIDE. SIMILARLY, BECAUSE OF ITS BROAD FLEXIBILITY AND INTERNATIONAL CHARACTER, VMEBUS IS EMERGING AS A POPULAR HOST AND POST-PROCESSING ENVIRONMENT. ALTHOUGH SOME SYSTEMSHAVE BEEN DESIGNED THAT ALLOW COMMUNICATION BETWEEN FASTBUS AND VMEBUS, NONE TAKE FULL ADVANTAGE OF THE WIDE RANGE OF COMMUNICATION MODES THAT ARE POSSIBLE WITH THESE BUS STRUCTURES. THIS PROJECT SUGGESTS THAT WITH THE PROPER KNOWLEDGE OF THESE BUS STRUCTURES, CURRENT INTERFACE TECHNOLOGY, AND THE SPECIFIC NEEDS OF THE PROSPECTIVE USERS OF THESE SYSTEMS, A MORE WIDELY ACCEPTED AND POWERFUL FASTBUS TO VMEBUS INTERFACE COULD BE DESIGNED. TO THIS END A DETAILED STUDY OF FASTBUS AND VMEBUS SPECIFICATIONS WILL BE CARRIED OUT. A STUDY OF AVAILABLE VME-FASTBUS INTERFACES WILL PROVIDE IMPORTANT KNOWLEDGE ABOUT THE STRENGTHS AND LIMITATIONS OF THE CURRENT TECHNOLOGY. A SURVEY OF USERS, ESPECIALLY IN THE HIGH ENERGY PHYSICS COMMUNITY, WILL YIELD VALUABLE INFORMATION ABOUT THEIR PARTICULAR REQUIREMENTS FOR SUCH A DEVICE. THEN, ALL OF THIS INFORMATION WILL BE USED TO DETERMINE A DESIRED SET OF INTERFACE FEATURES. THE FEASIBILITY OF INCORPORATING THESE FEATURES INTO ONE OF SEVERAL GENERAL MODELS WILL BE JUDGED. ON THE BASIS OF THIS JUDGEMENT, A DETAILED DESCRIPTION OF THE PLANNED DEVICE WILL BE SUBMITTED ALONG WITH A BLOCK DIAGRAM INDICATING THE DEVICE'S FUNCTIONAL ELEMENTS AND THEIR INTERCONNECTIONS. FINALLY, APPROPRIATE PHASE II DEVELOPMENT WILL BE RECOMMENDED.

* information listed above is at the time of submission.