Lnr Communications Inc.

Basic Information

180 Marcus Blvd
Hauppauge, NY, 11788

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 22


  1. ACT-BASED SIGINT RECEIVER 1F SIGNAL PROCESSOR

    Amount: $306,153.00

    N/A

    SBIR Phase II 1992 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  2. MODULATION BASED PULSE ASSOCIATION TECHNIQUES

    Amount: $49,802.00

    WITH THE PROLIFERATION OF RADARS THAT USE RAPIDLY VARYING TRANSMITTED PULSE PARAMETERS TO AVOID DETECTION AND RECOGNITION, UNINTENTIONAL MODULATION ON SAID PULSES MAY BECOME A PRIMARY RECEIVED SIGNAL ...

    SBIR Phase I 1990 ArmyDepartment of DefenseDepartment of Defense
  3. ACT-BASED SIGINT RECEIVER 1F SIGNAL PROCESSOR

    Amount: $49,870.00

    N/A

    SBIR Phase I 1990 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  4. 30 GHZ REFLECTION MODE FET SOLID STATE POWER AMPLIFIER

    Amount: $534,080.00

    A PHASE 1 PROGRAM IS PROPOSED TO PERFORM A DESIGN STUDY TO DEMONSTRATE THE FEASIBILITY OF REALIZING A LOW COST KA-BAND (30 GHZ) REFLECTION MODE FET SOLID STATE POWER AMPLIFIER (SSPA), EXHIBITING A MIN ...

    SBIR Phase II 1989 National Aeronautics and Space Administration
  5. PULSED SOLID STATE POWER AMPLIFIERS FOR 30/20 GHZ SATCOM TERMINAL UPLINK TRANSMITTER

    Amount: $49,761.00

    THE EVOLUTION OF ADVANCED 30/20 GHZ SATCOM SYSTEMS FOR DEPLOYMENT IN THE LATE 1980'S AND EARLY 1990'S EMPHASIZES THE USE OF WIDEBAND PREDOMINANTLY DIGITAL TRAFFIC, SERVICINGMANY DISPERSED USER GROUND ...

    SBIR Phase I 1989 National Aeronautics and Space Administration
  6. SPREAD SPECTRUM DETECTION CIRCUITRY

    Amount: $494,000.00

    SPREAD SPECTRUM AND RELATED LOW PROBABILITY OF INTERCEPT (LPI) RADAR AND COMMUNICATIONS SIGNALS PRESENT AN EXTREME CHALLENGE TO INTERCEPT OR ESM RECEIVERS BY VIRTUE OF THEIR BROAD BANDWIDTH, BELOW-NOI ...

    SBIR Phase II 1989 ArmyDepartment of DefenseDepartment of Defense
  7. TRANSPORTABLE RF SIMULATOR FOR ESM TEST/TRAINING APPLICATION

    Amount: $50,000.00

    AN RF SIMULATION SYSTEM THAT CAN BOTH TEST ELECTRONIC SUPPORT MEASURE (ESM) RECEIVING SYSTEMS AND TRAIN ESM OPERATORS WOULD HAVE MANY ADVANTAGES. THE EQUIPMENT WOULD HAVE TO PRODUCE MULTIPE RF SIGNALS ...

    SBIR Phase I 1989 NavyDepartment of DefenseDepartment of Defense
  8. 30 GHZ REFLECTION MODE FET SOLID STATE POWER AMPLIFIER

    Amount: $49,348.00

    N/A

    SBIR Phase I 1988 National Aeronautics and Space Administration
  9. 60 GHZ IMPATT DIODES

    Amount: $49,046.00

    GALLIUM ARSENIDE (GAAS) IMPATT DIODES ARE THE PRIMARY CANDIDATES FOR USE AS THE ACTIVE ELEMENT IN 60 GHZ SOLID STATE COMBINATORIAL (OR ACTIVE APERTURE) TRANSMIT POWER AMPLIFIERS FOR LONG RANGE WIDEBAN ...

    SBIR Phase I 1988 Air ForceDepartment of DefenseDepartment of Defense
  10. IMPROVED ELECTRONIC SUPPORT MEASURES SENSOR CAPABILITIES

    Amount: $49,016.00

    PRESENT SHIPBOARD AUTOMATED BROAD BAND ELECTRONIC SUPPORT MEASURES (ESM) SYSTEMS HAVE MULTI-TARGET, AUTOMATIC DETECTION AND DISPLAY CAPABILITIES. BECAUSE OF THE ENVIRONMENTAL SIGNAL DENSITY AND THE RE ...

    SBIR Phase I 1988 NavyDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government