Materials Engineering &

Basic Information

2611 Wickliffe Rd
Columbus, OH, 43221

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. Positron Annihilation Spectroscopy Techniques for Composite Characterization

    Amount: $69,574.00

    While the benefits of using composite materials in engineering applications are well known, industry growth has been limited by a number of factors that make it difficult to use composite materials in ...

    SBIR Phase I 1995 Army Department of Defense
  2. IMPROVED AEROSOL CAN

    Amount: $293,486.00

    CANS WILL BURST FROM OVER-PRESSURIZATION AS A RESULT OF THE AEROSOL CAN IS A CONSUMER CONVENIENCE ITEM USED FOR MANYYEARS. HOWEVER, SAFETY PROBLEMS HAVE EXISTED BECAUSE THE CANS WILL BURST FROM OVER-P ...

    SBIR Phase II 1991 Department of Transportation
  3. IMPROVED AEROSOL CAN

    Amount: $49,813.00

    N/A

    SBIR Phase I 1990 Department of Transportation
  4. WITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS.

    Amount: $49,941.00

    WITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS . THE USE OF SHEAR-HORIZONTAL (SH) WAVES HAS PROVEN PART DEFECTS. FOR FRACTURE MECHA ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  5. HIGH TEMPERATURE AND/OR HIGH SPEED THICKNESS GAUGING OF METALS

    Amount: $469,262.00

    TWO DIFFERENT APPROACHES TO HIGH TEMPERATURE ELECTROMAGNETICACOUSTIC-WAVE TRANSDUCER (EMAT) DESIGN AND CONSTRUCTION WILLBE EVALUATED. THE RESULTING EMAT'S WILL BE USED TO PERFORM INSERTION LOSS, ULTRA ...

    SBIR Phase II 1984 Department of Energy
  6. FOLLOWING A POST-IRRADIATION THERMAL ANNEAL CYCLE

    Amount: $50,000.00

    THIS RESEARCH WILL DETERMINE THE CHARACTERISTICS OF FATIGUE INITIATION LIFE, FATIGUE CRACK GROWTH RATES, AND SLOW-STABLECRACK EXTENSIONS FOLLOWING A POST-IRRADIATION ANNEAL. FATIGUE INTITIATION LIFE W ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  7. HIGH TEMPERATURE AND/OR HIGH SPEED THICKNESS GAUGING OF METALS

    Amount: $44,000.00

    N/A

    SBIR Phase I 1983 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government