Materials Engineering &

Company Information

Company Name
Materials Engineering &
Address
2611 Wickliffe Rd
Columbus, OH, 43221
Phone
n/a
URL
n/a
DUNS
n/a
Number of Employees
n/a
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$263,328.00
5
SBIR Phase II
$762,748.00
2
Chart code to be here

Award List

  1. FOLLOWING A POST-IRRADIATION THERMAL ANNEAL CYCLE

    Amount: $50,000.00

    THIS RESEARCH WILL DETERMINE THE CHARACTERISTICS OF FATIGUE INITIATION LIFE, FATIGUE CRACK GROWTH RATES, AND SLOW-STABLECRACK EXTENSIONS FOLLOWING A POST-IRRADIATION ANNEAL. FATIGUE INTITIATION LIFE W ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  2. HIGH TEMPERATURE AND/OR HIGH SPEED THICKNESS GAUGING OF METALS

    Amount: $469,262.00

    TWO DIFFERENT APPROACHES TO HIGH TEMPERATURE ELECTROMAGNETICACOUSTIC-WAVE TRANSDUCER (EMAT) DESIGN AND CONSTRUCTION WILLBE EVALUATED. THE RESULTING EMAT'S WILL BE USED TO PERFORM INSERTION LOSS, ULTRA ...

    SBIR Phase II 1984 Department of Energy
  3. WITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS.

    Amount: $49,941.00

    WITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS . THE USE OF SHEAR-HORIZONTAL (SH) WAVES HAS PROVEN PART DEFECTS. FOR FRACTURE MECHA ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. IMPROVED AEROSOL CAN

    Amount: $293,486.00

    CANS WILL BURST FROM OVER-PRESSURIZATION AS A RESULT OF THE AEROSOL CAN IS A CONSUMER CONVENIENCE ITEM USED FOR MANYYEARS. HOWEVER, SAFETY PROBLEMS HAVE EXISTED BECAUSE THE CANS WILL BURST FROM OVER-P ...

    SBIR Phase II 1991 Department of Transportation
  5. Positron Annihilation Spectroscopy Techniques for Composite Characterization

    Amount: $69,574.00

    While the benefits of using composite materials in engineering applications are well known, industry growth has been limited by a number of factors that make it difficult to use composite materials in ...

    SBIR Phase I 1995 ArmyDepartment of Defense
  6. HIGH TEMPERATURE AND/OR HIGH SPEED THICKNESS GAUGING OF METALS

    Amount: $44,000.00

    N/A

    SBIR Phase I 1983 Department of Energy
  7. IMPROVED AEROSOL CAN

    Amount: $49,813.00

    N/A

    SBIR Phase I 1990 Department of Transportation

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government