Memory Metals Inc.

Address

83 Keeler Ave
Norwalk, CT, 06854

Information

DUNS:
# of Employees: 20

Ownership Information

Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N

Award Charts




Award Listing

  1. NOVEL ACOUSTIC DAMPING MATERIALS

    Amount: $225,000.00

    COMPOSITE MATERIALS WITH RESIN, METAL AND CERAMIC MATRICES ARE ASSUMING A LEADING ROLE IN AEROSPACE, AIRCRAFT, TRANSPORTATION AND MARINE STRUCTURAL DESIGN. ALTHOUGH POSSESSING HIGH STRENGTH AND STIFFN ...

    SBIRPhase II1990Navy Department of Defense
  2. SHOCK-RESISTANT CIRCUIT BREAKERS

    Amount: $49,488.00

    TRANSIENT SHOCKS CAN CAUSE NUISANCE TRIPPING OF CIRCUIT BREAKERS AND INTERRUPT THE POWER SUPPLY VITAL TO COMMUNICATION AND COMPUTER EQUIPMENT. SHOCK-RESISTANT STABILITY OF CIRCUIT BREAKER COMPONENTS C ...

    SBIRPhase I1989Navy Department of Defense
  3. NOVEL ACOUSTIC DAMPING MATERIALS

    Amount: $44,559.00

    N/A

    SBIRPhase I1989Navy Department of Defense
  4. SME JOINTS AND COUPLING FOR ADVANCED COMPOSITE MATERIALS

    Amount: $202,000.00

    ADVANCED MATERAILS, SUCH AS GRAPHITE/EPOXY AND METAL MATRIX COMPOSITES, EXHIBIT REMARKABLE MODULUS TO WEIGH PERFORMANCE.THESE MATERIALS ARE CURRENTLY BEING USED IN COMMERCIAL AND MILITARY APPLICATIONS ...

    SBIRPhase II1987National Aeronautics and Space Administration
  5. SHAPE MEMORY ALLOYS

    Amount: $46,720.00

    THE LIVESTOCK INDUSTRY, FROM AN ANIMAL PRODUCTION VIEWPOINT,IS INCREASINGLY USING CONFINEMENT SYSTEMS TO INCREASE PRODUCER EFFICIENCY. IT IS VERY IMPORTANT FOR THESE CONFINEMENT SYSTEMS TO HAVE A GOOD ...

    SBIRPhase I1985Department of Agriculture
  6. AND CONVENTIONAL HIGH-FIELD MAGNET SYSTEMS

    Amount: $47,835.00

    THE ELECTRICAL SYSTEMS ASSOCIATED WITH HIGH-FIELD MAGNETS USED IN MAGNETIC CONFINEMENT FUSION APPARATUS HAVE BECOME EXCEEDINGLY COMPLICATED. IN THE VERY HIGH-FIELD, ELECTRO-MAGNET SYSTEMS USED FOR THE ...

    SBIRPhase I1985Department of Energy
  7. SME JOINTS AND COUPLING FOR ADVANCED COMPOSITE MATERIALS

    Amount: $44,775.00

    N/A

    SBIRPhase I1985National Aeronautics and Space Administration
  8. CONFINEMENT SYSTEMS

    Amount: $46,000.00

    THE SUCCESSFUL DEVELOPMENT OF FUSION ENERGY REQUIRES THE SOLUTION OF MANY ENGINEERING PROBLEMS, ONE OF WHICH IS THE PROVISION AND MAINTENANCE OF LEAK-TIGHTNESS THROUGH THE SEVERAL SEALS OF THE FUSION ...

    SBIRPhase I1984Department of Energy
  9. THE CONTINUED EXPLOITATION OF GEOTHERMAL RESOURCES IN THE UNITED STATES IS LIMITED BY THE AVAILABILITY OF SUITABLE MATERIALS OF CONSTRUCTION OF THE SEVERAL SEALS, BOTH STATIC AND DYNAMIC, UTILIZED IN SEVERAL COMPONENTS OF THE SYSTEM.

    Amount: $47,000.00

    THE CONTINUED EXPLOITATION OF GEOTHERMAL RESOURCES IN THE UNITED STATES IS LIMITED BY THE AVAILABILITY OF SUITABLE MATERIALS OF CONSTRUCTION OF THE SEVERAL SEALS, BOTH STATIC AND DYNAMIC, UTILIZED IN ...

    SBIRPhase I1984Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government