Meridian Corp.

Company Information

Company Name
Meridian Corp.
Address
4300 King St #400
Alexandria, VA, 22302
Phone
n/a
URL
n/a
DUNS
n/a
Number of Employees
n/a
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$291,784.00
6
SBIR Phase II
$775,553.00
3

Award List

  1. MUNITIONS LOADING VIA A ROBOTIC STEWART PLATFORM UNDER CLOSED LOOP CONTROL

    Amount: $175,000.00

    THIS STUDY INVESTIGATES THE ENHANCEMENT OF AIRCRAFT MUNITIONS LOADING PROCEDURES. PRESENTLY, MUNITIONS ARE TRANSPORTED FROM THE FLIGHT LINE TO THE AIRCRAFT ON A BOMB LIFT TRUCK EQUIPPED WITH A ONE DEG ...

    SBIR Phase II 1987 Air ForceDepartment of Defense
  2. QUEST: QUALITY ASSURANCE EXPERT SYSTEM TESTBED

    Amount: $101,000.00

    WHILE MEDICINE GENERALLY AND HEALTH CARE SPECIFICALLY HAVE BECOME INCREASINGLY DEPENDENT UPON COMPUTERS FOR DIAGNOSTICS, INFORMATION MANAGEMENT, AND EVEN NEW CAPABILITIES (E.G., CAT SCANNERS), ONE ARE ...

    SBIR Phase II 1987 Department of Health and Human Services
  3. FORCE REFLECTING JOYSTICKS FOR MANIPULATOR CONTROL

    Amount: $499,553.00

    A PERMANENT NEED EXISTS FOR HUMAN CONTROL OF MANIPULATORS IN HIGHLY UNSTRUCTURED ENVIRONMENTS. THE JOYSTICK IS A KEY ELEMENT IN THE INTERFACE BETWEEN MAN AND MACHINE. A PRIMARYOBJECTIVE IS TO TRANSLAT ...

    SBIR Phase II 1989 National Aeronautics and Space Administration
  4. MINIATURE CAPILLARY PUMPED HEAT TRANSFER COMPONENT

    Amount: $49,998.00

    THE NATURAL GENERATION OF HEAT WITHIN SEMICONDUCTOR DEVICES CAUSES SEVERAL PROBLEMS ASSOCIATED WITH HIGH OPERATING TEMPERATURES. THESE PROBLEMS INCLUDE POOR ELECTRICAL PERFORMANCE, INHOMOGENEOUS TEMPE ...

    SBIR Phase I 1987 NavyDepartment of Defense
  5. COMPUTER REQUIREMENTS FOR EPEDITING RDP ACTIONS AND CONTRACT DOCUMENTATION

    Amount: $49,964.00

    A PERMANENT NEED EXISTS FOR AN AUTOMATED PROGRAM MANAGEMENT SYSTEM WHICH OVERSEES CERTAIN ASPECT OF THE PROCUREMENT PROCESS. AN AUTOMATED PROCUREMENT ACQUISITION MANAGEMENT SYSTEM WOULD PROVIDE THE ME ...

    SBIR Phase I 1988 NavyDepartment of Defense
  6. FORCE REFLECTION AND TACTILE FEEDBACK TECHNOLOGY

    Amount: $49,971.00

    THIS RESEARCH INVESTIGATES BILATERAL TELEOPERATION OF A SIX DOF MANIPULATOR WITH A SEVEN DOF EXOSKELETON. THE EMPHASIS OF THIS RESEARCH IS PLACED ON THE CONTROL OF REDUNDANT FREEDOMS AND FORCE FEEDBAC ...

    SBIR Phase I 1988 Air ForceDepartment of Defense
  7. FORCE REFLECTING JOYSTICKS FOR MANIPULATOR CONTROL

    Amount: $50,000.00

    N/A

    SBIR Phase I 1988 National Aeronautics and Space Administration
  8. QUEST: QUALITY ASSURANCE EXPERT SYSTEM TESTBED

    Amount: $42,000.00

    N/A

    SBIR Phase I 1986 Department of Health and Human Services
  9. MUNITIONS LOADING VIA A ROBOTIC STEWART PLATFORM UNDER CLOSED LOOP CONTROL

    Amount: $49,851.00

    N/A

    SBIR Phase I 1986 Air ForceDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government